Forwards IE Insp Rept 50-346/82-06 on 820127-28.No Noncompliance Noted
ML20042B917
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/11/1982
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20042B918 List:
References
NUDOCS 8203260271
Download: ML20042B917 (2)


See also: IR 05000346/1982006

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

__ _ - _ _ _ _ _ _ _ _ .

t

.

March 11, 1982

Docket No. 50-346(DEPOS)

91

-

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

2

RECEP!ED

Vice President

Ol-

3

'

Nuclear

!,mR 2 51982S-

-

gyy;[ h -

6

?! d

Avenue

'

G

Toledo, Oli 43652

%

3

Gentlemen:

N

G

This refers to the special safety inspection conducted by Messers. L. Reyes

and W. Rogers of this office on January 27 and 29, 1982, of activities at

Davis-Besse Nuclear Station, Unit 1, and to the discussion of our findings

with T. Myers and Ms. J. Ilirsch and others of your staff at the conclusion

of the inspection.

The inspection of your prompt public notification / warning system was con-

ducted to determine whether your system as described in your letters of

February 4, January 8, 15, 22, 29, 1982 and December 30, 1981, has been

installed and tested.

Final judgment to determine if your system meets

the full design objectives of Appendix 3 of NUREG-0654 will be made

jointly by NRC and FEMA in the near future.

Our interim findings indicate that your system appears to meet the require-

ments of 10 CFR 50, Appendix E, Section IV.D.3.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

8203260271 820311

{DRADOCK05000

--

~

.

i

-

'

Toledo Edison Company

2

March 11, 1982

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part sought to be

withheld, and which contains a full statement of the reasons which are the

bases for the claim that the information should be witnheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-

tion sought to be withheld shall be incorporated as far as possible into a

separate part of the affidavit.

If we do not hear from you in this regard

within the specified periods noted above, a copy of this letter and the

enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/

~

)((,

a

J. A. Hind, Director

g Division of Emergency Preparedness

and Operational Support

Enclosure:

Inspection Report

No. 50-346/82-06(DEPOS)

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Health

RIII,

RIIQ

RIII

RIII

RIII

RI I g

Vr

%h

&

Q

' " /f

f

'

G

Pdte son /so

Grant

Axslton

Pa eriello

Hunter

p, y nd

'

3/4/82

3Ao