ML20042B917
| ML20042B917 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/11/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20042B918 | List: |
| References | |
| NUDOCS 8203260271 | |
| Download: ML20042B917 (2) | |
See also: IR 05000346/1982006
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__ _ - _ _ _ _ _ _ _ _ .
t
.
March 11, 1982
Docket No. 50-346(DEPOS)
91
-
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
2
RECEP!ED
Vice President
Ol-
3
'
Nuclear
!,mR 2 51982S-
-
gyy;[ h -
6
?! d
Avenue
'
G
Toledo, Oli 43652
%
3
Gentlemen:
N
G
This refers to the special safety inspection conducted by Messers. L. Reyes
and W. Rogers of this office on January 27 and 29, 1982, of activities at
Davis-Besse Nuclear Station, Unit 1, and to the discussion of our findings
with T. Myers and Ms. J. Ilirsch and others of your staff at the conclusion
of the inspection.
The inspection of your prompt public notification / warning system was con-
ducted to determine whether your system as described in your letters of
February 4, January 8, 15, 22, 29, 1982 and December 30, 1981, has been
installed and tested.
Final judgment to determine if your system meets
the full design objectives of Appendix 3 of NUREG-0654 will be made
jointly by NRC and FEMA in the near future.
Our interim findings indicate that your system appears to meet the require-
ments of 10 CFR 50, Appendix E, Section IV.D.3.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
8203260271 820311
{DRADOCK05000
--
~
.
i
-
'
Toledo Edison Company
2
March 11, 1982
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so
that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons which are the
bases for the claim that the information should be witnheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld shall be incorporated as far as possible into a
separate part of the affidavit.
If we do not hear from you in this regard
within the specified periods noted above, a copy of this letter and the
enclosed inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/
~
)((,
a
J. A. Hind, Director
g Division of Emergency Preparedness
and Operational Support
Enclosure:
Inspection Report
No. 50-346/82-06(DEPOS)
cc w/ enc 1:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
RIII,
RIIQ
RIII
RIII
RIII
RI I g
Vr
%h
&
Q
' " /f
f
'
G
Pdte son /so
Grant
Axslton
Pa eriello
Hunter
p, y nd
'
3/4/82
3Ao