THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O UOX S000 m CL EVEL ANo ohio 44101 o T E L E PHONF (2 t61622 9800 m ILLUMIN 4 [ I
' PUBLIC SOU AAE
\\
S Servm f Best Locats
. He Nation D:lwyn R. Davidson Q';C?.D 3
Vicf FHE Lit NT usu v e.uno n % no consmucnou March 18, 1982 O;l pgS?.,7 I N
2
-4 "T8hgge.:
6 Mr. James G. Keppler 8
Director, Region III
<b Of fice of Inspection and Enforcement N
U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Poner Plant Docket Nos.
50-440, 50-441; Status of Seismic Clearance on Gould Pumps, Inc.
(RDC 44(82))
Dear Mr. Keppler:
The purpose of this report is to provide the status of a potential significant deficiency regarding a design change made relative to pumps supplied by Gould Pumps, Incorporated, which did not appear to be factored into their respective seismic reports.
This item was originally identified to Mr. L. McGregor of Region III by Mr. R. Vondrasek cf the Perry Nuclear Power Plant on December 21, 1981, which was followed up by an interim report on January 15, 1982.
DESCRIPTION OF POTENTIAL DEFICIENCY During an NRC inspection at the Perry Nuclear Power Plant by Mr.
I. Yin of Region III, several questions were raised concerning the scismic reports for the Emergency Service Water Pump llouse pumps supplied by Gould Pumps, Incorpor-ated, located in the City of Industry, California.
At that time, a Perry Nuclear Power Plant Deviation Analysis Report (DAR078) was initiated indicating a potential breakdown of Could's Quality Assurance Program in the area of design control.
EVALUATION OF POTENTIAL DEFICIENCY A meeting was held at Gould Pumps facility in the City of Industry, California, on February 24 and 25, 1982. Attendees at this meeting included Mr.
I. Yin of Region III of the NRC, representatives from Gilbert Associates Incorporated (architect / engineer of the PNPP), Gould's seismic consultant and a representative from The Cleveland Electric Illuminating Company's Quality Assurance Department.
Reviewed in depth were the initial questions identified by Mr. Yin, the cchnical acceptability of the seismic reports prepared for PNPP and an evaluation of Could's Quality Assurance Program implemented in the design control area.
8203260254 820318 R ADOCK 05000440 MAR 2 21982 S
$5/f bl
r 9
e
!!r. James C. Keppler March 18, 1982 Page Two Results of this, meeting indicate that the reports surplied by Gould Pumps, Incorporated, meet the technical requirements for the PNPP.
In addition, the evaluation of Could's design control program in effect at the time indicated satisfactory implementation and that the problem initially identified is not considered reportable under 10CFR50.55(e). To preclude further questions in this area, however, Could has consented to review their program in this area and provide a more detailed method of documenting their design review.
Sincerely,
]
}"
ca f '. duabf o
Dalwyn R. Davidso, Vice President System Engineering and Construction DRD/llp cc: NRC Site Of fice Director of Inspection and Enforcemcnt U. S. Nuclear Regulatory Commission Washington, D.C.
20555 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555