MAR 0 b W4
Docket No. 50-336
,
g7
Northeast Nuclear Energy Company
a
/
ATTN: Mr. W. G. Counsil
's
s
Senior Vice President - Nuclear
y
" 2WD
-
Engineering and Operations Group
u
nra y gg.
-9
,
P. O. Box 270
-
m e w , o .,~_
,
Hartford, Connecticut 06101
G
- SZ5n
'
s)h
w
Gentlemen'
'
M
Subject:
Inspection No. 50-336/82-03
This refers to the routine safety inspection conducted by Mr. C. Petr,ne of this
office on January 11-15, 1982 at Millstone Nuclear Power Station, Unit No. 2,
Waterford, Connecticut, of activities authorized by NRC License No. DPR-65 and
to the discussions of our findings held by Mr. Petrone with Mr. E. Mroczka of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980. You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix
A.
In addition to the need for corrective action regarding this specific item
of noncompliance, we are concerned about the implementation of your management
control systems that permitted it to occur.
Consequently, in your reply, you
should describe in particular, those actions taken or planned to improve the
effectiveness of your management control systems.
In accordance with 10 CFR 2.790 of the Commissica's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or your con-
tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is
necessary that you (a) notify this office by telephone within ten (10) days from
the date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application to
this office to withhold such information. Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld from public disclosure. This
RI:DETI
RI:DETI
RI:DETI
Petrone/pja
Bettenhauwn
Ebne
r-
8d032$0540 820308
y fk
\\
PDRADOCK05000h
0FFICIAL RECORD COPY
O
$/,
.
.
Northeast Nuclear Energy Company
2
section further requires the statement to address with specificity the considera-
tions listed in 10 CFR 2.790(o)(4). The information sought to be withheld shall
be incorporated as far as possible into a separate part of the affidavit.
If we
do not hear from you in this regard within the specified periods noted above,
the report will be placed in the Public Document Room. The telephone notification
of your intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor, Files,
Mail and Records, USNRC Region I, at (215) 337-5223.
The responses directed by this letter are not subject to the clearance procedures
of the office of Management and Budget as required by the Paperwork Reduction
Act of 1989, PL 96-511.
Your cooperation within this matter is appreciated.
Sincerely,
%isinal Siccod 3 g 8. [W
7
[DivisionofEngineeringandTechnical
homas T. Martin, Director
u
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-336/82-03
cc w/encls:
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation' Facilities Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)