ML20042B678
| ML20042B678 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/02/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20042B679 | List: |
| References | |
| NUDOCS 8203250519 | |
| Download: ML20042B678 (2) | |
See also: IR 05000333/1981010
Text
os a <>
.
.
.
W32
10,9 2
Docket No. 50-333
e
. kf
A
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
07
%
ATTN: Mr. Corbin A. McNeill, Jr.
/2/
'N"MO
y
Resident Manager
j'
.,
'm .?".g g g
g
. y n'
P. O. Box 41
'
, . , , , , . . , , ,
,
,_
Lycoming, New York 13093
(i'
"T
y
u
y
\\' A
Gentlemen:
y o
c,.o
.
'
Subject:
Inspection 50-333/81-?9
This refers to the routine safety inspection conducted by Mr. R. Baer of this
office on April 14-17 and 27, 1981, of activities authorized by NRC License
No. OPR-54 and to the discussions of our findings held by Mr. Baer with yourself
at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels described in the Federal Register
Notice (45 FR 66754) dated October 7, 1980. You are required to respond to
this letter and in preparing your response, you should follow the instructions
in Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of -
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
f
r
g.y
g
RI:FfiPS
R tFRPS
0
TIB
RI:
Baer/mjd
Knapp
Joyner
Mar in, T.
i
2/g/82
2/J.2/82
2/%G/82
/
2
IS
OFFICIAL RECORD COPY
i
l
gRADOCK03250519 820302
05000333
G
bd
,
(
.
.
Power Authority of the State of
2
11 ;. 3
153 2
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
W
Thomas T. Martin, Director
Division of Engineering and Technical
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-333/81-10
cc w/encis:
George T. Berry, Executive-Director
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmar.n, Vice President - Quality Assurance
M. C. Cosgrove, Quality' Assurance Superintendent
J. F. Davis, Chairman, Safety Review Committee
C. M. Pratt, Assistant General Counsel
W. F. Harrington, Director of Security and Safety
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New York
NRC Resident Inspector
bec w/encls:
Region I Docket Roor. (w/ concurrences)
Chief, Operational Support Section (w/o encls)
l
Director, DPRP
i
I
,
l
OFFICIAL RECORD COPY
1
L