Forwards IE Insp Rept 50-416/81-56 on 811116-1215 & Notice of Violation
ML20042B672
Person / Time
Site: Grand Gulf 
Issue date: 01/20/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20042B642 List:
References
NUDOCS 8203250511
Download: ML20042B672 (2)


See also: IR 05000416/1981056

Text

'

) fellow

.

.

JAN 2 01982

Mississippi Power and Light Company

. ATTN:

Mr. N. L. Stampley

Vice President of Production

,

,

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject:

Report No. 50-416/81-56

This refers to the routine safety inspection conducted by Mr. A. G. Wagner of

this office on November 16 - December 15, 1981, of activities authorized by NRC

Construction Permit No. CPPR-118 for the Grand Gulf facility.

Our preliminary

findings were discussed with Mr. G. B. Rogers, Site Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

,

In additios, to the need for corrective action regarding these specific

violations, we are concerned about the implementation of your quality assurance

program that permitted their occurrence.

Consequently, in your reply, you should

describe in particular those actions taken or planned to improve the effective-

ness of your quality assurance program.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold infomation contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

,

G

,

-.

,-.

r

4

Hississippi Power & Light Company

2

JAN 2 01982

Should you have any questions concerning this letter,~ we will' be glad to discuss -

them with you.

Sincerely,

0skW/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-416/81-56

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. ficCoy, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of flississippi

.

es

RII

RII

RII

RII

hA

N

fier

Id

ell

RClewis b

er:gr

12/ -/81

12/-/B1

12/--4 81

12/ /81

//tQ7L

/ /tyhu

//t y/sz

I/tsy'n-