Text
'
) fellow
.
.
JAN 2 01982
Mississippi Power and Light Company
. ATTN:
Mr. N. L. Stampley
Vice President of Production
,
,
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject:
Report No. 50-416/81-56
This refers to the routine safety inspection conducted by Mr. A. G. Wagner of
this office on November 16 - December 15, 1981, of activities authorized by NRC
Construction Permit No. CPPR-118 for the Grand Gulf facility.
Our preliminary
findings were discussed with Mr. G. B. Rogers, Site Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
,
In additios, to the need for corrective action regarding these specific
violations, we are concerned about the implementation of your quality assurance
program that permitted their occurrence.
Consequently, in your reply, you should
describe in particular those actions taken or planned to improve the effective-
ness of your quality assurance program.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold infomation contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
,
G
,
-.
,-.
r
4
Hississippi Power & Light Company
2
JAN 2 01982
Should you have any questions concerning this letter,~ we will' be glad to discuss -
them with you.
Sincerely,
0skW/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-416/81-56
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. ficCoy, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of flississippi
.
es
RII
RII
RII
RII
hA
N
fier
Id
ell
RClewis b
er:gr
12/ -/81
12/-/B1
12/--4 81
12/ /81
//tQ7L
/ /tyhu
//t y/sz
I/tsy'n-