O AC40. RA NRC MONTHLY OPERATING REPORT DOCKET NO.

50-206 DATE 4-12-81 COMPLETED BY l_M Inv TELEPHONE (71aiah? 7700 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating station, Unit 1
2. Reporting Period: March 1. loa 1 thenunh March 11. 1981
3. Licensed Thermal Power (MWt):

1347 456

4. Nameplate Rating (Gross MWe):

l S. Design Electrical Rating (Net MWe):

436 456

6. Maximum Dependable Capacity (Gross MWe):

d'A

7. Masimum Dependable Capacity (Net MWe)-
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Cive Reasons:

N.A.

9. Power Level To Which Restricted.If Any (Net MWe): NA
10. Reasons For Restrictions.lf Any:

N.A.

This Month Yr. to.Date Cumulative 744 2160 120.Q20 it. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 0

0 84.611.4

13. Reactor Reserve Shutdown Hours n

n og ni c; 9

~~'~-

14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown llours 0

0 81.114.1

16. Gross Thermal Energy Generated (MWH) n 0

104.084.261 17 Gross Electrical Energy Generated (MWH) 0 0

35.526.434

18. Net Electrical Energy Generated (MWH)

O' O

31.664_042 0

0

~ 70.1

19. Unit Senice Factor
20. Unit Availability Factor 0

0 70_1

21. Unit Capacity Factor IUsing MDC Net) 0 0

67.4 0

0 67.4

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 100 100 15.9
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:

Steam generator reoair in orogress

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

MAY 31,1981

26. Units in Test Status IPrior to Commercial Operationi: N.A.

Forecast Achieved INITI A L CRITICA LITY INITIAL ELECTRICITY CO\\lMERCI AL OPER ATION 8203250461 810412 DR ADOCK 05000206 DR j

o AVER AGE D AILY UNIT POWER LEVEL DOCKET NO.

50-206 UNIT - SONGS 1 DATE 4-12-81 COMPLETED BY J.M. J0Y TELEPHONE (714)492-7728 MONTH.

March. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL iMWe Neti (Mwe. Net)

I n

0 37 2

n is 0

3 0

39 0

4 0

20 0

s 0

21 0

6 0

22 n

7 0

23 0

8 0

24 0

9 0

25 n

10 0

26 0

1I n

27 0

62 0

28 0

13 0

29 0

14 0

30 o

15 0

31 0

16 0

...o(ilni

...n.

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-706 UNIT NAME RMPR 1 DATE d-17 Al COMPLETED BY J_M JOY REPORT MONTH March. 14A1 TELEPHONE (71didQ2-777R E*

r.

3:

.=1 e s

ysx Licensee g-r,

Cause a Correctne g?

N"-

DJ'c i

~?

4

.2 s E Event 7

g Action to Report 2

<E U EL Prevent Recurrence 3.

3 5 =g u

C 55 80-7-12 F

5569 B

1 80-14 CC HT EXCH Steam Generator Tube Repair i

1 2

3 4

f: Forced Reason:

Methml:

I >.hibit F -Instsuctions S. Scheduled A-Lyuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for 1.icensec C-Refueling 3 Automatic Scram.

Event Report il I Rt fde (NURI G-D-Regulator) Restriction 4-Other (Explain) 0161i l'-Operator Training & License Examination F Admiuistrative 5

G-Operatiemal l's vor I Ew plain )

I'sinbiill. Same Source Il-Othes (INplain t PSSOl0)570 90E W 8/78

e

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. so 9ns UNIT SONCd 1 DATE 4-12-n1 COMPLETED BY J.M. JOY TELEPHONE (714) do2-772n The Unit remained in cold shutdown the entire month for steam generator tube repair.

1 esso (s) are ms w s/re

REFUELING INFORMATION DOCKET NO. 50-206 UNIT SONGS 1 DATE 4-12-81 COMPLETED BY J.M. J0Y TELEPHONE (714) 492-7728 1.

Scheduled date for next refueling shutdown.

Not yet determined 2.

Scheduled date for restart following refueling.

MAY 31,1981 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

Proposed Change No. 88 to POLDPR-13 Appendix A, Technical Specification 3.5.2 Control Rod Insertion Limits 4.

Scheduled dats for submitting proposed licensing action and supporting information.

February 8, 1980 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures, i

None 6.

The number of fuel assemblies.

a)

In the core 157 b)

In the spent fuel storage pool. ga l

7.

Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity. None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

April, 1983 l