ML20042B600

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1981
ML20042B600
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/10/1981
From: Joy J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20042B596 List:
References
NUDOCS 8203250453
Download: ML20042B600 (5)


Text

..

~

s W

AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.

50-206 DATE 3-1 0-81 COMPLETED BY

.1

.1n v TELEPHONE (71 A ) 92-7700 OPERATING STATUS

1. Unit Name:

San Onnfra Nucipar conor 2+4"a C+=+1on, Unit 1

2. Reporting Period:

February 1.1981. thenunh Fahruary 28, 1981 1347

3. Licensed Thermal Power (MWt):

456

4. Nameplate Rating (Gross MWe):

436

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

456 436

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N.A.

N.A.

9. Power Level To which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions,if Any:

N.A.

This Month Yr.-to-Date Cumulative 672 1416 120,176*

11. Hours In Reporting Period 0

0 84,611.4

12. Number Of Hours Reactor Was Critical y

0 0

13. Reactor Reserve Shutdown Hours u

u ui,ii4.i

14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown flours 0

0 104,084,261

16. Gross Thermal Energy Generated (MWH) 0 0

35.526.434

17. Gross Electrical Energy Generated (MWH) 0 0

33.664.042

18. Net Electrical Energy Generated (MWH) 0 0

70.5*

19. Unit Service Factor 0

0 70.5*

20. Unit Availability Factor 0

0 68.0*

21. Unit Capacity Factor IUsing MDC Net) 0 0

68.0*

22. Unit Capacity Factor IUsing DER Net) 100 100 15.2
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Steam Generator Repair In Proaress

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

N.A.

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY CO\\1MERCIAL OPER ATION 8203250453 B10310 PDR ADOCK 05000206

  • Corrected Values PDR

~

Y AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-206 UNIT SONGS 1 DATE 3 10 R1 COMPLETED BY J. Jov TELEPHONE (7141492-7700 MONTH February,1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Neu qMwe. Net 3 1

0 17 0

2 0

is 0

3 0

39 0

4 0

20 0

s 0

21 0

6 0

22 n

7 0

23 0

J 0

24 n

9 0

0 25 10 0

26 0

1I O

0 27 12 0

28 n

0 13 29 14 n

3o I5 0

3 l

16 0

i i

j reso(s) ni new one l

UNITSHUTDOWNS AND."OWER REDUCTIONS DOCKET NO.

50-206 UNIT NAME SONGS 1 DATE 1 10-Rl February, l981 COMPLETED BY il M My REPORT MONTH TELEPHONE f 714ia47 7700 n.

c jg 3

4 E5 Licensee gg

{g Cause & Conectne No.

Date i

3g 4

jj$

Event gy 9?

Action to H

3 dj =e Report =

co O E'

Prevent Recurrence u

6 55 80-07-12 F

4825 B

1 80-014 CC HT EXCH Steam Generator Tube Repair i

2 3

4 F: Forced Reason:

Method:

Exhibit F. instructions S. Schednleil A Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance of Test 2-Manual Scram.

Entr) Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repori (I I R1 File (NURin D-Regulatory Restriction 4-Ot her ( Explain) 01611 1.-Opesator Training & License Examination F Administrative 5

G-Operational I nor ( E xplain )

Esinbit 11-Same Source Il-Ot hes (1:xplaini essali) in c../,.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH 00CKET N0.

50-206 UNIT SONGS 1 DATE 3-1 0- 81 COMPLETED BY J.M. Jo y TELEPHONE (714)492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.

. n.at el n. a s..n.

ae REFUELING INFORMATION DOCKET NO. 50-206 UNIT SONGS 1 DATE 3-1 0- 81 COMPLETED BY J.M. Joy TELEPHONE (714)492-7700 1.

Scheduled date for next refueling shutdown.

Not yet determined 2.

Scheduled date for restart following refueling.

April 15,1981 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

Proposed change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits 4.

Scheduled date for submitting proposed licensing action and supporting information.

February 8,1981 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 6.

The number of fuel assemblies, a)

In the core 157 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

21 6 Intended change in spent fuel storage capacity. None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

April 1983

....t o n.... o,.