ML20042B584

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1981
ML20042B584
Person / Time
Site: San Onofre 
Issue date: 01/05/1982
From: Raidy T
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20042B573 List:
References
NUDOCS 8203250440
Download: ML20042B584 (5)


Text

i if AC40. RA NRC MONTHLY OPERATING REPORT DOCKET NO.

50-206 COMPLETED B alW TELEPHONE l-714-492-7700 Ext. 702 OPERATING STATUS

1. Unit Name:

h h % h laar f' mar =*hg et? %n

2. Reporting Period:

1 P+M er 1981 thm@ 11 r h,;or 1981

3. Licensed Therma! Power (MWt):

1947 -

456

4. Nameplate Rating (Gross MWe):

436

5. Design Eleetrical Rating (Net MWe):

456

6. Maximum Dependable Capacity (Gross MWe):

436

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gin Reasons:

i N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative 744 n >Kn ig7, rg i1. Hours in Reporting Period 7 34.5 2499.1 R7ngs a

12. Number Of Hours Reactor Was Critical

' N I

E

~

13. Reactor Reserve Shutdown Hours 730.25 2331.85 81.449 n;
14. Hours Generator On.Line N

I I

15. Unit Resene Shutdown Hours 865.744 2,594,643 106,678.905
16. GrosEThermal Energy Generated (MWH) 258,000 840,000 36,366,434 17 Gross Electrical Energy Generated (MWH) 242.54R 77o 7ao 34 4?? _ n11 lb. Net Electrical Energy Generated (MWH) 98.15%

26.62%

67.97%

19. Unit Senice Factor
20. Unit Availability Factor
98. E%,,__

26.62%

A7_Q7a 74.77%

20.39%

65.68%

21 Unit Capacity Factor (Using MDC Net, 7

74.77%

20.39%

65.68%

22. Unit Capacity Factor (Using DER Net) 73.26%

22.21%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 MonthsiType.Date.and Duration of Eacht:

'lko sMHed outacest Fahrnary 1992.1 a.w.

March 1982,10 wh

25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achieved INITI \\ L CRITICALITY INITI A L ELECTRICITY CO%t%lERCI AL OPER ATION 8203250440 920114 PDR ADOCK 05000206 R

e......,,,,. ! R B

I AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-206 UNIT N1 DATE 1-5-82 COMPLETED BY T-Rairiv TELEPHONE 1-713-407-7700 Ext. 702 MONTH noenmhor DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe.Ne: 3 I

370 37 370 2

170 18 170 i

3 170 19 370 4

370 20 370 5

370 2:

370 6

370 22 370 7

370 23 170 3

370 24 370 9

170 25 370 10 370 26 370 Ii 313 2;

370 161 28 170 12 13 370 29 370 14 370 30 370 is 370 3:

370 in 370

=

9 PSSOltl371 N E gr 3 / 78

UNIT SHUTDOWNS AND POWE3 REDUCTIONS DOCKET NO.

50-206 UNIT NAME SONPS 1 DATE l -4R7 COMPLETED BY T-hiriv REPORT MONTH hr TELEPHONE l-714-49b 77An Ext. 702 e.

E E

5?

3 j E5 1.icensee h

h Cause A Correceive No.

Daic i

4

.3 s &

Event g?

o.?

Action to

~=

E j gg g Repois a mV j'

Prevent Recurrence t5 71 Lec.11, '81 S

13.75 A

1 N. A.

H.. A. Turbin Repair steam leak on H. P. Turbine 72 Dec.24, '81 F

.25 A

4 N. A.

H. J. xxxxxxxxx Reduced load to 372 Mf.

Steam flow to armonia stripper caused a re-duction of condenser vacuun. Steam flow to air ejectors was increased to resolve the problem.

l 2

1 4

I. l'orced Reason:

Method; Enluhis F. Instinciiims S SchedulcJ A-1:<luipment failure (Explain)

1. Manual for Preparation of Data it Maintenance or Test 2 Manual Scram.

Ener> Sheets for I.icensee C Refncling 4 Automatic Scram.

I' vent Repost iI I Rll' ale iNL:RI G-D Regulainig Restriction 4-Oiher tlixplam) 0161) 1 -Opes.sius Training & litense I.xaminaison F-Adnunnt rative 5

G-Oper.ilion.sl I a ror ( F mpt. sin i lTinbiill S.smc Sonice ll Othes (laplain t neolilen

. e n.

e

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.. 50-206 UNIT sors i DATE l-5-82 COMPLETED BY T. Raidy TELEPHONEl-714-492-7700

~ Ext. 702 Dec. 1, 0001 Unit on line at 390 m Dec. 1, 0045 Isolation valve'CV-531 for PORV 545 failed open - diaphram repaired CV-531 declared operable at 0930 Dec. 4 Dec. 11, 2302 Unit off line for IsTair of leak on HP Turb. cover and repair of level transmitter ~

for LI-3400A Dec. 12, 0230 Reactor Sub Critical for work in sphere Dec. 12, 1002 Reactor critical Dec. 12, 1247 Unit on line at 22 W Dec. 12, 1526 thit at 390 N Dec. 24, 1915' Ibit load r d M to 372 m caused by reduction in condenser vacutan j

Dec. 24, 1930 Vacturn problem associated with operation of autonia stripper. Problen corrected.

thit load 390 W Dec. 31, 2400 thit on line at 390 W 4

1

...old an n s..n.

REFUELING INFORMATION DOCKET NO. 50-206 UNIT SONGS 1 DATE 1-4-82 COMPLETED BY T. Raidv TELEPHONE 1-714-492-7700 Ext. 702 1.

Scheduled date for next refueling shutdown.

July 1983 2.

Scheduled date for restart following refueling.

Octnber 1983 3.

Will refueirng or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet detemined What will these be?

Not yet detemined 4.

Scheduled dato for submitting proposed licensing action and supporting information.

Not yet detemined 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet detemined 6.

The number of fuel assemblies.

a)

In the core is7 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity. None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

October 1984

... 10 m u..n.

. -.