Text
.
c AC40 RA t
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE 10/2/81 COMPLETED BY T RAIDY j
TELEPHONE 71 d-dQ7-7700 OPERATING STATUS 2/O
- 1. Unit Name:
SAN ONOFRE NUCLEAR GFNFRATING STATION, UNIT l
- 2. Reporting Period:
SEPTEMBER 1, 1981 THROUGH SEPTEMBER 30, 1981 1347
- 3. Licensed Thermal Power (MWt):
456
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456 436
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since last Report.Give Reasons:
N.A.
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr. to.Date Cumulative 720 6551 131.611 II. Hours in Reporting Period
- 12. Number Of Hours Resctor Was Critical 51.50 /4c/.2 MCG.T 7es m g
"""a
- 13. Reactor Reserve Shutdown Hours 0
0 0
51.5 953.0 82,067.
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown flours 0
0 0 /ee as9..
62716 99 fan ^^";':7
' a!,0"", ^2? a,W
- 16. Gross Thermal Energy Generated (MWH) 19.800 333,600 36,173,834 17 Gross Electrical Energy Generated (MWH) 15,795 302,409 33,966,451
- 18. Net Electrical Energy Generated (MWH1 7.15%
14.54%
68.29%
- 19. Unit Sersice Factor
- 20. Unit Availability Factor 7.15%
14.54%
68.29%
5.03%
10.59%
65.71 %
- 21. Unit Capacity Factor tusing MDC Nett 5.03%
10.59%
65.71 %
- 22. Unit Capacity Factor IUsing DER Net)
- 23. Unit Forced Outage Rate 92.8%
85.4%
21.9%
- 24. Shutdowns Scheduled Oser Nest 6 Month > (Ty pe. Date.and Duration of Each t:
Scheduled, January 1982, 6 weeks l
I
- 25. If Shul Down At End Of Report Period. Estimated Date of Startup:
October 19. 1981.
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed l
INITI \\ L CRITICALITY INITIAL ELECTRICITY
- 2 CO\\l\\tERCI A L OPER ATION O
/,
/W 8203250425 811013 T
PDR ADOCK 05000206 lA
/O 1
R pop g_
AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NO.
50-206 LNIT Sests 1 DATE 1 0/2/81 COMPLETED BY T. RAIDY TELEPHONE 714-492-7700 ext. 297 MONTH September DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe. Net I gywe.Negi I
372 i7 0
2 370 0
Is 3
61.62 i,
0 4
0.0
- o 0
5 0.0 0
21 6
0.0 0
,2 7
0.0 0
23 s
0.0 24 0
9 0.0 0
25 lo 0.0 26 0
si 0.0 0
0.0 0
12 33 13 0.0 29 0
14 0.0 0
30 0.0 0
is z,
0.0 i3
....i.:.......,,.
UNIT SHUTDOWNS AND POWER REDUCT10NS DOCKET NO.
50-206 UNIT NAME SONflS 1 DATE 10/2/81 COMPLETED BY T RAIDY REPORT MONTH SFPTDEER TELEPHONE 714-492-7700 ext. 297 "E
l icensee
,E r, h,
5E 3
h Yk Cause & Currective Date i
3g 4
jgE Event 7
9.?
Action to 32 5
jgg Report =
uiu
]'
Pievent Recurrence 6
67 Sept. 3,81 F
668.!
A 2
LER 020 SF Valves Tests show HV valves will not open with design AP. New design being installed and testing in progress.
LER 021 EB Instru Voltage regulator filter choke failed to ground. Regulator was temporarily jumpered for power continuity, and has subsequently been repaired.
1 2
3 4
I. Dirced Reauen:
Method:
lixinhit F -Instinctions S Si bed nicil A 1:quipment Failure (Explain)
- 1. Manual for Preparation of Data Il Maintenance of Test 2-Manual Scram.
Entr> Sheets fin 1.icennee C. Refueling 4 Automatic Scram.
I' vent Repost il l R)l'ile iNLtRI G-D-Reynl.itnig Restriction 4-Other (lixplani) 01bli I -Opesatos haimnp & l.itense lixamination I: Adnunntrative 5
(s Opel.stion.nl l s gos (l%pl. sin n l'\\hibit ll S.sme.\\oulee 11 Olhen II spl.nn) essoti),n us = ein.
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS 1 DATE 1 0/2/81 COMPLETED BY T. RAIDY - __
TELEPHONE 714-492-7700 ext. 297 9/l: 0001 Unit operating at 390 MWe 9/2: 0332 The unit was tripped due to a failure of No. 1 regulated power bus resulting in a loss of feedwater flow indication and cohtrol.
Safety Injection Initiated due to low RCS pressure. The control operator noted that the Safety Injection System did not align properly. Safety Injection was terminated after an evaluation of plant conditions showed no evidence of a loss of coolant.
9/3:
The failed Twinco voltage regulator for No.1 regulated 120 volt bus was replaced by a new unit and tested satisfactorily.
The unit remained shut down for the rest of September for the redesign and testing of the Safety Injection System and its components.
O
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS 1 DATE 1 0/ 2/ 81 COMPLETED BY T. RAIDY TELEPHONE 714-492-7700 ext. 297 1.
Scheduled date for next refueling shutdown.
MARCH 1983 2.
Scheduled date for restart following refueling.
MAY 1983 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
NOT YET DETERMINED What will these be?
4.
Scheduled date for submitting proposed licensing action and supporting information.
NOT YET DETERMINED 5.
Important licensing considerations associated with refueling, e.g.
new or different fuel des.ign or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
NOT YET DETERMINED 6.
The number of fuel assemblies, a)
In the core 1s7 b)
In the spent fuel storage pool.
94 7.
Licensed spent fuel storage capacity.
21 6 Intended change in spent fuel storage capacity.
NONF 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
OCTOBER 1984
....t.),......n.
AC40 RA j
s NRC MONTHLY OPERATING REPORT AMMENDMENT I DOCKET NO.
50-206 DATE 9/17/81 COMPLETED BY T. RAIDY TELEPHONE 714-447-7700 ext. 297 OPERATING STATUS SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 1
- 1. Unit Name:
JULY 1, 1981 THRUUGH JULY 31, 1981
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe): 436
- 6. Maximum Dependable Capacity (Gross MWe):
456 436
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N.A
- 9. Power Level To Which Restricted. If Any (Net MWe):
NONE
- 10. Reasons For Restrictions,If Any:
NONE _
f\\ /)
s JU l Y' This Month Yr..to.Date Cumulative I1. Hours in Reporting Period 744 5087 130,147 302.8 609.6 85,253.9*
- 12. Number Of Hours Rescror Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 0
288.2 549.4 81,663.4*
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Ilours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 311318.1 534.057.6 104,618,319 17 Grow Electrical Energy Generated (MWH) 115,200 190,800 35,717 106,662 172,293 33.836 126. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 3R 7T 10.8%
68.8%*
- 20. Unit Availability Factor 38.7%
10.8%
68.8%*
32.9%
7%
66.1%*
- 21. Unit Capacity Factor IUsing MDC Net, 32.9%
7%
66.1%*
- 22. Unit Capacity Factor (Using DER Net!
- 23. Unit Forced Outage Rate 61.26%
94%
- 21. d.
- 24. Shutdowns Scheduled Oser Nest 6 Month >IT.spe.Date.and Duration of Eacht:
SCHEDULED, JANUARY 1982, 6 WEEKS
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
0/l4/0I
- 26. Units in Test Status iPrior to Commercial Operationp:
Forecast Achiesed INITI A L CRITICALITY INITI \\ L ELEC TRICITY COMMERCIAL OPER \\TlON
- CHANGED FROM ORIGINAL REPORT DATED 7/4/81 p....l.1 n..
.n.
l-
e e' l
'f AC40. R A NRC MONTHLY OPERATING REPORT Amendment I DOCKET NO.
50-206 DATE 10/2/81 COMPLETED BY T pai rly TELEPHONE 711 192-7700 OPERATING STATUS SAN ONOFRE NUCLEAR GENERATING RTATION, UNIT 1
- 1. Unit Name:
- 2. Reporting Period:
AUGUST 1,1981 THROUGH AtIn119T 31,1981 1347
- 3. Licensed Thermal Power (MWt):
456
- 4. Nameplate Rating (Gross MWe):
436
- 5. Design Electrical Rating (Net MWe):
456
- 6. Maximum Dependable Capacity (Gross MWe):
436
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratin,es (Items Number 3 Through 7) Since Last Report.Give Reasons:
N. A.
NONE
- 9. Power Level To which Restricted,1f Any (Net MWe):
^NM
- 10. Reasons For Restrictions.lf Any:
f)//
r v.Z
' i.l 7T s
This Month Yr..to.Date Cumulative 744 5831 130.891 i1. Hours In Reporting Period 367 976.8 85,621.1*
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Resetor Reserve Shutdown Hours 352.1 901.5 82.015.5
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown llours 388260 922539*
105006579*
- 16. Gross Thermal Energy Generated (MWH, 123.000 111.R00 9%Ran_97a 17 Gross Electrical Energy Generated (MWH) 114.321 286.614 33.950.656
- 18. Net Electrical Energy Generated (MWH) 47%
15%
69%
- 19. Unit Service Factor 47%
15%
69%
- 20. Unit Availability Factor 35%
11%
66%
- 21. Unit Capacity Factor (Using MDC Net) 35%
11%
66%
- 22. Unit Capacity Factor IUsing DER Net) 53%
85%
21.4%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Month,(Type.Date,and Duration of Eacht:
SCHEDULED, JANUARY 1982, 6 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status IPrior eo Commercial Operation)-
Forecast Achiesed INITI A L CRITICA LITY INITI AL ELECTRICITY COMMERCIAL OPER ATION
- change from original report dated 9/4/1981