Monthly Operating Rept for May 1981
ML20042B529
Person / Time
Site: San Onofre 
Issue date: 06/08/1981
From: Walda R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20042B528 List:
References
NUDOCS 8203250397
Download: ML20042B529 (5)


Text

.

AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO. 50-206 DATE A R-Al COMPLETED BY P

um1, n

TELEPHONE f 71 Ud?2-7700 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating statinn Unit 1
2. Reporting Period: May 1, 1981 throuch May 31. 1981 1347
3. Licensed Thermal Power (MWt):

456

4. Nameplate Rating (Gross MWe):

436

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): dRA
7. Maximum Dependable Capacity (Net MWe):

436

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

N.A.

N.A.

9. Power Level To Which Restricted,if Any(Net MWe):
  • ^*
10. Reasons For Restrictions. lf Any:

This Month Yr..to.Date Cumulative 744 3623*

122407*

i1. Hours in Reporting Period 0

0 84,611.4

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

'O 0

14. Hours Generator On.Line 0

0 81,114.1

15. Unit Reserve Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

104.084.261

17. Gross Electrical Energy Generated (MWH) 0 0

35.526.434

18. Net Electrical Energy Generated (MWH) 0 0

33.664.042

19. Unit Service Factor 0

0 69.2

20. Unit Availability Factor 0

0 69.2

21. Unit Capacity Factor IUsing MDC Net) 0 0

66.5 0

0 66.S

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 100 100 17.1
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each):

evenu <ruenavnn nena'R IN PROGRESS 0203250397 810609 PDR ADOCK 05000206 R

PDR

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

.lijNE 19; lQA1

26. Units in Test Status IPrior to Commercial Operation): N.A.

Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION

  • Corrected values

D AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-200 UNIT SONGS 1 DATE g_3 gj COMPLETED BY R. Waldo TELEPHONE (714)492-7700 MONTH May: 10A1 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Neti 1

0 17 0

2 0

l8 0

3 0

19 0

4 0

20 0

s n

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

io 0

26 0

ii 0

27 0

12 0

0 23 0

0 13

,9 14 0

30 0

15 0

3:

0 I c, 0

...o t i) ir.

.. fi.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.

50-206 UNIT NAME SONGS 1 DATE 6-R-R1 REPORT MONTH MAY, 1981 COMPLETED BY R. Waldo m EPHONE (714I492-7700 n.

E E

3?

3 j Ei Licensee

,E g

{n, Cause & Corrective No.

Date i

5=

4 2sE Event gi

n. ]

Action to f:

5gg Report a mV EU Prevent Recurrence H

o O

55 80-07-12 F

7032 B

1 80-014 CC HTEXCH STEAM GENERATOR TUBE REPAIR 1

2 3

4 f: Forced Reason:

Method:

Exhibii F. Instructiims S. Scheduleil A I:quipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entr> Sheets lor I.icensee C-Refueling 3 Automatic Scram.

Eveni Report iI l:R) File (NURI G-D. Regulatory Restriction 4-Other ( Explain) 0161) 1:-Opcialor Training & License Exa.,ination F Administrative 5

G-Operational 1 rror I Explain t Eshibit II Same Source Il-Other (Explaini 3

PSSOft)370 NEWS /F0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET N0.

50-206 UNIT SONGS 1 DATE 6 81 COMPLETED BY R. W. Waldo TELEPHONE (7141492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.

i

[

l PSSOlt) 379 NEWS /78

g*..

REFUELING INFORMATION DOCKET NO.

50-206 UNIT SONGS 1 CATE 6-8-81 COMPLETED BY R. W. Waldo TELEPHONE (714) 492-7700 1.

Scheduled date for next refueling shutdown.

NOT YET DETERMINED.

2.

Scheduled date for restart following refueling.

JUNE 12,1981.

3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

YES What will these be?

Change No's: 76, 92, 93, 96, 100, 104, were identified in an NRC telecon on May 20, 1981 as return to power items.

4.

Scheduled date for submitting proposed licensing action and supporting

"*#76-10/20/78, #92-4/4/80, #93-6/30/80, #96-12/1/80

  1. 100-12/10/80 revised 5/15/80, #104-5/5/81 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or su'pplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

NONE 6.

The number of fuel assemblies.

a)

In the core 157 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity.

NONE 8.

Projected date of last refueling that can ce discharged to spent fuel storage pool assuming present capacity.

JUNE,1984

...om u. %,..,,,

.