Monthly Operating Rept for Apr 1981
ML20042B524
Person / Time
Site: San Onofre 
Issue date: 05/12/1981
From: Joy J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20042B521 List:
References
NUDOCS 8203250391
Download: ML20042B524 (5)


Text

.

O

. AC40 - R A NRC MONTHLY OPERATING REPORT l

DOCKET NO.

50 206 DATE 5-1 2-81 COMPLETED BY J. JOV TELEPHONE (714)492-7700 OPERAThwG STATUS

1. Unit Name: San Onofre Nuclear Generatina Station, Unit 1

~

2. Reporting Period: _ April 1,1981 through April 30, 1981 1347
3. Licensed Thermal Power (MWt):

456

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

456

6. Maximum Dependable Capacity (Gross MWe):

436

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (lians Number 3 Through 7) Since Last Report. Give Reasons:

N.A.

9. Power Level To Which Restricted,if Any (Net MWe):

N.A.

N.A.

10. Reasons For Restrictions,If Any:

This Month Yr. to-Date Cumulative 1979 489

& Wf.o N

121,1M&--

11. Hours in Reporting Period 0

0 84,611.4

12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 0

0 81,114.1

14. Hours Generator On-Line
15. Unit Reserve Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

104.084.261 17 Gross Electrical Energy Generated (MWH) 0 0

15;596;414

18. Net Electrical Energy Generated (MWH) 0 0

33.664.042

19. Unit Service Factor 0

0 69.6 0

0 69.6

20. Unit Availability Factor 0

0 66.9

21. Unit Capacity Factor (Using MDC Net) 0 0

66.9

22. Unit Capacity Factor (Using DER Net) 100 100 16.5
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

June 4. 1981.

25 If Shut Down At End Of Report Period, Estimated Da:e of Startup:

N.A.

Forecast Achieved

26. Units in Test Status (Prior to Commercial Operation):

INITI A L CRITICA LITY INITI AL ELECTRICITY CO\\tMERCIAL OPER All0N 8203250391 810514 PDR ADOCK 05000206 R

PDR m

a AVERAGE DAILY UNIT POWER LEVEL DOGET NO.

50-206 UNIT SONGS 1__

DATE 5-12-81 COMPLETED BY J. Joy TELEPHONE (714)492-7700 MONTH Apri1. 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net)

(MWe-Net i 1

0 0

37 2

0 is 0

3 0

0 i9 4

0 20 0

5 0

21 0

6 0

22 n

7' 0

0 23 8

0 24 0

9 0

25 0

10 0

26 0

Ii 0

27 0

12 0

s 0

13 0

29 14 0

30 15 0

3i 16 g

asso(i) ni ma w etre y----

,,em, r

p e--

--m e

=,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-206 UNIT NAME SONGS 1 DATE 5-12-81 April,1981 COMPLETED BY d M 00 V REPORT MONT11 11ELEPHONE (714)492-7700 "E

Licensee

,Ev, fe,

.!E 3

h Ek Cause & Corrective Date i

5@

d is5 Event a '2

9. ~8 Action to

~ di =g Report 2 N0 E'

Prevent Recu rence

$2 5

o u

e O

N.e P

55 80-07-12 F

-6009-B 1

80-014 CC HT EXCH Steam Generator Tube Repair i

2 3

4 l' : Forced Reason:

Method:

Exhibit F. instructions S. Scheduled A l:quipment failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.

Entry Sheets for 1.icensee C Refueling 3-Automatic Scram.

I: vent Report il 1:R) File (NllRI G-D-Regulator) Restriction 4-Other ( E xplain) 0161) 1:-Operator Training & License Examination F Administrative 5

G-Operational 1 r ror ( E splain)

Exhibit ll-Same Source Il-Other (INplain )

esso (i) ni c..n.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH I

DOCKET NO.

50-206 UNIT SONGS 1 DATE 5-12-81 COMPLETED BY J. M. Joy TELEPHONE (714)492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.

4 1

e l

reso(s) sri== = efs.

-~

?EFUELING INFORMATION DOCKET NO.

50-206 j

UNIT SONGS 1 DATE S-12 81 COMPLETED BY a.M.any TELEPHONE (7141492-7700 1.

Scheduled date for next refueling shutdown.

Not yet determined 2.

Scheduled date for restart following refueling.

June 4,1981 3.

Hill refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

Proposed change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits 4.

Scheduled date for submitting proposed licensing action and supporting information.

February 8,1981 5.

Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 6.

The number of fuel assemblies.

a)

In the core 157 b)

In the spent fuel storage pool.

94 7.

Licensed spent fuel storage capacity.

21 6 Intended change in spent fuel storage capacity.

7.one 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

April 1983

...ota n. m.n.