Forwards IE Insp Repts 50-321/81-34 & 50-366/81-34 on 811121-1220 & Notice of Violation
ML20042B372
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/28/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20042B364 List:
References
NUDOCS 8203250257
Download: ML20042B372 (2)


See also: IR 05000321/1981034

Text

.

J'ellsk

'

.

.

.

.

JAN 2 81982

Georgia Power Company

,

ATTN: fir. J. H. Miller, Jr.

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject:

Report Nos. h l/81-3 (and 50-366/81-34

This refers to the routine safety inspection conducted by Mr. R. F. Rogers of

this office on November 21 - December 20, 1981, of activities authorized by NRC

Operating License Nos. DPR-57 and NPF-5 for the Hatch facility.

Our preliminary

findings were discussed with 11r. ft. lianry, Plant flanager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

en' closed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Roon unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of !!anagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

'

,

8203250257 820317

PDR ADOCK 05000321

G

PDR

-

'

'

'

.

.

,

.

JAN 2 81982

,

Georgia Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul 1. Kellogg, Chief

Reactor Project Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report tios. 50-321/81-34

and 50-366/81-34

cc w/ encl:

'

J. T. Beckham, Vice President and

.

General fianager-fluclear Generation

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

bcc w/ enc 1:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document Management Branch

,

State of Georgia

.

1

l

RII

RII

RII

td

LD

RRoMe)s:dtVBrbnlee

PJ

logg

'

r

1/gh/82

1/11/82

1/

82

-

. - - .

.

-

-

-