ML20042B336
| ML20042B336 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/09/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20042B337 | List: |
| References | |
| NUDOCS 8203250226 | |
| Download: ML20042B336 (2) | |
See also: IR 05000373/1982006
Text
w . e
.
MAR 9
1982'
,
at
N
0
RECEtVED
3
6-
Docket No. 50-373(DPRP)
-
MAR 2 41982 > T3
-
ss is.u tsuen stacas
Commonwealth Edison Company
S
m g~m u
ATrN:
Mr. Cordell Reed
p
Vice President
b
Post Office Box 767
Ch
@
Chicago, IL 60690
This refers to the routine safety inspection conducted by Messrs. R. D. Walker
and S. E. Shepley of this office on January 4, 1982 through February 5, 1982,
of activities at the LaSalle County Nuclear Station, Unit 1, authorized by
NRC Construction Permit No. CPPR-99 and to the discussion of our findings
with Mr. R. H. Holyoak at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with perscnnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
h
P
G
I (
.
.-
.
(
.
.
.-
.
Commonwealth Edison Company
2
, March 9, 1982
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
W pa-
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No.-50-373/82-06(DPRP)
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
.
RIII
RIII
III
j
/
PC
<
t
Walker p
Knop
Spessard
3/3/82
5t/g