Forwards IE Insp Rept 50-373/82-06 on 820104-0205 & Notice of Violation
ML20042B336
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/09/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20042B337 List:
References
NUDOCS 8203250226
Download: ML20042B336 (2)


See also: IR 05000373/1982006

Text

w . e

.

MAR 9

1982'

,

at

N

0

RECEtVED

3

6-

Docket No. 50-373(DPRP)

-

MAR 2 41982 > T3

-

ss is.u tsuen stacas

Commonwealth Edison Company

S

m g~m u

ATrN:

Mr. Cordell Reed

p

Vice President

b

Post Office Box 767

Ch

@

Chicago, IL 60690

This refers to the routine safety inspection conducted by Messrs. R. D. Walker

and S. E. Shepley of this office on January 4, 1982 through February 5, 1982,

of activities at the LaSalle County Nuclear Station, Unit 1, authorized by

NRC Construction Permit No. CPPR-99 and to the discussion of our findings

with Mr. R. H. Holyoak at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with perscnnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

h

P

G

I (

.

.-

.

(

.

.

.-

.

Commonwealth Edison Company

2

, March 9, 1982

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'

W pa-

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No.-50-373/82-06(DPRP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

.

RIII

RIII

III

j

/

PC

<

t

Walker p

Knop

Spessard

3/3/82

5t/g