ML20042B186
| ML20042B186 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/19/1974 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20042B187 | List: |
| References | |
| NUDOCS 8203250064 | |
| Download: ML20042B186 (3) | |
See also: IR 05000003/1974016
Text
. _ _ .
_ _ .
_
. _ _ . _ . _
_ . . _ . . _ _ _ _
_ _ _ _ _
-
-
. _ _ . _ _ _
I e, "
' *
UNITED ST ATf.$
'I
- ,,N;
'
Atomic ENERGY COMMISSit
f/
I,
castrevoss a rc or ret c.ut.a t c a y orova.. as
-'s'
re u.s o re s
5
631 PAnr. AVENUE
,
Q. ' ' ;
.
.- !
KING OF PRUS$f A. PENNSYLV ANI A 19406
N. ,-)'
'
DEC 191974
'
'
Consolidated Edison Company of New
License Nos. DPR-5
York. Inc.
Attention:
Mr. W. J. Cahill, Jr.
CPPR-62
Vice President
Inspection Nos. 50-03/74-16
4 Irving Place
50-247/74-16
10003
50-286/74-23
j
Gentlemen:
'
This refers to the inspection conducted by Mr. Fasano and
other members of this office on November 18-22, 1974 at
j
3
your Indian Point Units 1, 2 and 3 and Ucstchester Service
Center in Duchanan, Nc;r, York and your Technical Services
and Development Department and Corporate Headquarters in New
York, New York of activitics authorized by AEC License Nos.
DPR-5, DPR-26 and CPPR-62 and to the discussions of our findings
held by Mr. Fasano and other =cmbers of this office with Mr.
'
Beer, Mr. Stein and other members of your staff at the conclusion
-
of the incpection,
j
Arcas examined during this inspection are described in the Regulatory
i
'
Operations Inspection Report which,is enclosed with this 1cteer.
Uithin these areas, the inspection consisted of selective examinations
of procedurcs and representative records, interviews with personnel,
and observations by the inspector.
'
During this inspection, it was found that certain of your activities
appeared to be in viointion of AEC requirements.
The items and
<
'
references to the pertinent requirements are listed in the enclosure
to this letter.
This letter constitutes a not. ice sent to you
pursuant to the provisions of Section 2.201 of the AEC's " Rules
of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within 20 days
of your receipt of this notice, a written statement of explanation
in reply, including: (1) corrective steps which have been or will
be taken by you, and the results achieved; (2) corrective steps
,
which will be taken to avoid further violations; and (3) the
date when full compliance will be achieved.
~
.
.
.
!
/
b ) '.
,
l'p-)
.
l
8203250064 741219
'
PDR ADOCK 05000003
... .,
G
'
-
--
_
.
_. . _ _ . . , . . _ _ _ _ _ _ _ _ . . _ _ . . -_
- .
.
.
. .
.
-
.;-_.
. - . -
--
_
-_-.--__- - .
. _
- _ _ .
- ----
. ,,
..
'
Consolidated Edit
Company of New York, Inc.
.
- '
-2-
-
.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
Part 2, Title 10, Code of rederal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
AEC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be preprietary, it is
necessary that you make a uritten application within 20 days to
this office to eithhold such information from public disclosure.
Any such application must include a full statement of the
-
reasons on the basis of which it 'is claimed that the information
is proprietary, and should be prepared so that proprietary
l
information identified in the application is contained in a
i
separate part of the document.
If we do not hear from you in
this regard within the specified period, tLa rep rt vill be
placed in the Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
.
,
.
0hi0h
p
mes P. O'Reilly
-
Di ector
-
(
Enclosures:
-
1.
Deceription of Violations
s
2.
RO Inspection Report Nos. 50-03/74-16, 50-247/74-16 and
!
50-286/74-23
cc:
A. E. Upton, Esquire
!
A. Kohler, Resident Construction Manager
W. Stein, Manager, Nuclear Pouer G2neration Department
J. tiakepcace, Chief Engineer Unit 2
A. Z. Roisman, Counsel for Citizens Ceamittee for Protection
of the Environment (Without Report)
S. Cantone, Chief Engineer, Unit 3
.
edem N
--
- e
-
, . - -
-
a
v - -
n--
-
,,,-x--m
v------------4
. - - -
w
--
'
'.
. .
,
.,
.
. .
Concolidctc3 Edice
- oupany of liev 1*ork, Inc.
'
,
.
.,
-3
'
.
,
.
'
bec: RO Chief, FSLE2
RO:HQ (4 cpys of ler., 5 cpys of report)
R0 Tiles
Central l' ail & Files
DL (4 cpys of itr.,13 cpys of report)
RS (1 cpy of ler.~, 3 cpys of report)
Local PDP.
,
State of !!cv York
,
Reg Reg Reading Roo:s
'
RO Directors (II, III, IV) (Report Only)
f
MC
.
i
A. Z. Roicnan, Counsel for Citizens Comittca for Protection of the
l
Enviro = cut
6
e
l
-
,
l
l
l
I
l
.
4
m
- 9