ML20042B149

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-003/77-08,50-247/77-18 & 50-286/77-18 on 770531-0603 & Notice of Violation
ML20042B149
Person / Time
Site: Indian Point  
Issue date: 06/28/1977
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20042B150 List:
References
NUDOCS 8203250027
Download: ML20042B149 (3)


See also: IR 05000003/1977008

Text

.-

'

e

,

",

4

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

y

h .,

REGION i

.

j.~

e'

.

g

631 PARK AVENUE

{

KING OF PRUS$1 A. PENNSYl.V ANI A 19406

,,

.....

Docket Hos.50-003

c50-24.7

50-286

.

Consolidated Edison Company of

New York, Inc.

ATTN: Mr. W. J. Cahill, Jr.

'

Vice President

4 Irving Place

New York, New York 10003

Gentlemen:

Subject:

Combined Inspection 50-03/77-08, 50-247/77-18 and

50-286/77-18

,

,

This refers to the inspection conducted by Mr. R. Conte of this office

on May 31-June 3,1977, at Buchanan, New York of activities authorized -

by NRC License Nos. DPR-5, DPR=26 and DPR-64 and to'the discussions of

our findings held by Mr. Conte with Mr. T. Law and other members of your

staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. Makepeace, Director of Technical Engineering and

Mr. Ruhlman of this office on June 6,1977 and between Mr. Law, Plant

Manager, and Mr. Ruhlman on June 8,1977.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the

items of noncompliance brought to your attention in letters dated

!

January 20, 1977 and January 25, 1977.

We have no fuither questions

'

l

regarding your action at this time.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

,

as set forth in the Notice of Violation, enclosed herewith as Appendix

'

.

A.

These items of noncompliance have been categorized into the levels

as described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

8203250027 770628

-

PDR ADOCK 05000003

G

PDR

.

- - .

_

.-.

-_ . - .

.

. _ _ _ _

.

s

.

s

'

,-

.

.

Consolidated Edison Company of

2

JUN 2 81977

New York, Inc.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

With respect to Appe.1 dix A, we note that you have corrected Item No. D,

and therefore you need not address yourself to this matter in your

response.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2 Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accom-

panied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which con-

tains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph

(b)(4) of Section 2.790.

The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period,

the report will be placed 13 the Public Document Room.

'

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

-

j' '(

1 --

a __

_

l

n

. Brunner, Chief

Re ctor Operations and Nuclear

S pport Branch

'

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection Report

Numbers 50-03/77-08; 50-247/77-18; 50-286/77-18

,

I

!

l

l

.

  • -

_

-_ _

.

. _ .

s

'

.

.

.

.

JUN 2 81977

Consolidated Edison Company

3

of New York, Inc.

cc w/ encl:

L. O. Brooks, Project Manager, IP Nuclear

E. Kessig, Acting Manager, fluclear Power Generation Department

,

T. Law, Plant Manager

L. M. Trosten, Esquire (Representing Con Ed)

,

J. M. Makepeace, Director, Technical Engineering

George T. Berry, General Manager and Chief Engineer

Z. E. Chilazi, Manager of Projects, Thermal Power Generation

A. Z. Roisman, Counsel for Citizens Committee for

Protection of the Environment (Without Report).

bec:

IE Mail & Files (For Appropriate Distribution)

Central Files

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Technical Information Center (TIC)

REG:I Reading Room

-

Region Directors (111, IV) (Report Only)

State of flew York

A. Z. Roisman, Counsel for Citizens Committee for

Protection of the Environment

._

i

,

.

.

e

e

e.