ML20042B043
| ML20042B043 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 05/15/1978 |
| From: | Kawula L CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| To: | Mcdonald W NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20042B044 | List: |
| References | |
| NUDOCS 8203240432 | |
| Download: ML20042B043 (6) | |
Text
,
N*
w Willi:m J. C hill, Jr.
vice Pres 4;nt Consolidated Eaison Company of New York. Inc.
4 frving Place. New York. N Y 10003 Telephone (212) 460-3819 May 15, 1978 Re:
Indian Point Station Unit Nos. 1 and 2 Docket Nos.50-003 and 50-247
,R; Mr. William G. Mcdonald, Director Q
Office of Management Information and Program Control
/.
c/o Distribution Services Branch, DDC, ADM d
U. S. Nuclear Regulatory Commission i.,3
~~
Washington, D. C.
20555 y
O.
Dear Mr. Mcdonald,
[
Enclosed you will find two (2) copies of the monthly oper-ating report relating to Indian Point Unit Nos. 1 and 2 for the month of April, 1978.
In addition, we are also enclosing an update on the refueling information requested in a January 18, 1978 letter from Mr. R. A. Hartfield, Acting Director of the Office of Management Information and Program Control.
This update pertains to Indian Point Unit No. 2 only.
Very truly yours,
. f,f'-
l l
.ys ' ~
.b. 't..
/,,
enc.
Copy to:
Dr. Ernst Volgenau, Director (40 copies)
Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C.
20555
~
Mr. Boyce H. Grier, Director Office of Inspection and Enforcement l
Region I U.
S. Nuclear Regulatory Commission
?
631 Park Avenue
.c,,,
,,m.,Ki,np^ of Prussia, Pennsylvania 19406 8203240432 780515 PDR ADOCK 05000003 N ({
R PDR Ng
-..:.c e r.4 1
_m_
I.
OPERATING DATA REPORT 50-003 DOCKET NO.
DATE 5/4/78 COhlPLETED BY L. Kawula 914-694-6000 TELEP110NE Ext. 20T @ I.p.
OPF R ATING STATUS Notes All fuel unloaded.
I~ Unit Name: -- Indian Point Unit No. 1 No decision on future
- 2. Reporting Penod:
April' 1978 operation.
- 3. Llbansed Thermal Power 1%!Wt):
- 4. Namkte Rating (Gross alWel:
S. Design E!)etrical Rating (Net 51we):
- 6. Staximum Dehdable Capacity (Gross $1We):
- 7. Slasimum Depen le Capacity (Net.\\lwe):
- 8. If Changes Occur in Capacity Ratinp (Items Number 3 Through 7) Since Last Report. Give Reasons:
N N
\\
- 9. Power Lesel To Which Restricted. lf'Any (Net.\\lwel:
\\
- 10. Reasons For Restrictions.If Any:
x e.
khis Ston'h Yr.-to.Date Cumulative II. Ilours in Reporting I ei..
- 12. Number Ofliours Reactor Was Criticat
- 13. Reactor Reserve Shutdown flours
- 14. Ilours Generator On Line
\\
- 15. Unit Resene Shutdown flours
- 16. Grow Thermal Energy Generated (51Wil)
Mme
- 17. Grow Electrical Energy Generated 1.ilWil)
_.. Applicable
- 18. Net Electrical Energy Generated (51%11)
\\
- 19. Unit Senice Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using \\lDC Net)
\\
- 22. Unit Capacity Factor!Using DER Net)
\\
l
- 23. Unit Forced Outage Rate
\\
- 24. Shutdowns Scheduled Oser Nest 6 Slonths ( f> pc. Date, and Duration of Each t:
l
- 25. If Shut Down At End of Retmrt Period. litimated Date of Startup:
O
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITI A L CRITICA LITY l
INITI Al. ELFCI RICl f Y l
Co\\ nit RCIA L OPERAIsos F/77)
o.
AVERAGE DAILY UNIT FOWER LEVEL DOCKET NO.50-003 UNiy I.P. Unit No. 1 DATE 5/4/78 COMPLETED BY L. Kawula 914-694-6000 TELEPflONE Ext. 209 9 I.P.
MONTil APfil' 1978 DAY AVER AGE DAILY POWER' LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
\\
I N
18
\\
3 N-39 4
.N 20 5
s\\
6 3,
7 23 8
N 24 9
N 25 U
10 6
II 2Ns\\
i 12
- g s
N
\\.
13 29 I4 30 15 3
16 INSTRUCTIONS
- ~.
?
On this format. list the average daily unit power lesel in MWe. Net for each day in the reportine month. Compute to the nearest whole megawatt.
s b
s.
\\
(9/77) f, i
,s I
k i
-)
- \\ Vs s
l\\\\
' M N
3 s t
x
- ?50-003 DOCKET NO.
, i UNIT SIIUTDOWNS AND pol.'ER REDUCIlONS UNI f N AM E I.P.
Unit No. 1 DATE 5/4/78 COMPLETED BY L.
Kawula REPORT MONTil April, 1978 914-694-off5'O TELEpilONE Ext. 209 9 I.P.
i E
c
.$ ?
3 d Il Licensee g-r, Eq Cause & Corsective No.
Date i
3g i
jj$
Event 3,7 h,?
Attiun to f-E
- o ;jij Report =
,mV E-Present Recurrente H
=
e c
6 I
L NONE I
2 3
4 F: Fenced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Esplain) l Manual for Picparation of Data B Maintenance of Test 2 Manual Scram.
Entr> Shects for Liecusee C-Refueling 3-Automatic Scram.
Esent Report (LERI Fde INUREG-D-Regulatuiy Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I-Same Source
(')/77)
Il-Other(Esplain)
~
l
r Indian Point Station Docket No.50-003 Unit Unit No. 1 Date May 5, 1978 Completed By J. Makepeace Telephone 914-739-8823 Summary of ' Operating Experience - April, 1978 1
All fuel unloaded, no decision on future operation.
i
Unit No. 1 Mechanical and Electrical Maintenanca l
Data Component MWR #
Malfunction Corrective Action None during March, 1978.
Indian Point Station Docket No.50-003 l
__