Forwards IE Insp Repts 50-003/77-02,50-247/77-06 & 50-286/77-07 on 770307-09 & Notice of Violation
ML20042B036
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/12/1977
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20042B037 List:
References
NUDOCS 8203240427
Download: ML20042B036 (3)


See also: IR 05000003/1977002

Text

..

.

\\

.

-

j#9'%

umTro sTATas

o

NUCLEAR REGULATORY COMMisslON

g g CI()g

y

Iy

-

< g , cf) ,g .

nacion

5

esirann avesva

nine or enussia, nnusvi.vma ie.es

-

g

kR 121977

    • ""

.

Docket Nos.50-003

50-247-

-

Q0_-2B6J

'

Consolidated Edison Company of

' New York, Inc.

ATTN: Mr. W. J. Cahill, Jr.

Vice President

4 Irving Place

-

New York, New York 10003

Gentlemen:

Subject:

Inspection 50-003/77-02, 50-247/77-06 and 50-286/77-07

This refers to the inspection conducted by Dr. C. J. Paperiello of this

office on March 7-9, 1977, at your Indian Point Station of activities

authorized by NRC License Nos. DPR-5, DPR-26 and DPR-64 and to the

discussions of our findings held by Dr. C. J. Paperiello with Mr. T. Law

and others of your staff at the conclusion of the inspection, and to a

subsequent telephone discussion between Dr. C. J. Paperiello and Mr. T.

Law on April 6,1977.

Areas examined during this inspection are described in the Office of

-

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representctive records, interviews with

personnel, and observations by the inspector.

In addition our Mobile Laboratory was also brought to your site and used

by the inspector to make certain independent measurements.

The basic

'

purpose of these independent measurements is to verify your capability

for analyzing radioactive effluents, and to achieve and maintain comparable

methods for analyses between your facility and the NRC.

The complete

data from these measurements will be reported in a subsequent Inspection.

Our inspector also verified the steps you had taken to correct the Items

l

of Noncompliance brought to your attention in a letter dated Aprd 2,

c

1976.

We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

.

as set forth in the Notice of Violation, enclosed herewith as Appendix

l

A.

This item of noncompliance has been categorized into the levels as

'

.

8203240427 770412

PDR ADOCK 05000003

G

PDR

1

. _ .

.

.

%

l

j

.

~

-

-

.

Cqnsolidated Edison Company

2

of New York, Inc.

described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice"

Part 2. Title 10. Code of Federal Regulations.

Although Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement of explanation,

we note that this item of noncompliance was corrected prior to the com-

pletion of our inspection, and therefore, no response with respect to

'

this matter is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2. Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

-

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b)(4) of Sectien 2.790.

The

information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

-

d

~

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-003/77-02, 50-247/77-06 and 50-286/77-07

.-

wy

-

~-


-

- -

- -

.

.

.

.

.,

-

.

C6nsolidated Edison Company

3

of Ne# York Inc.

-

.

cc:

L. O. Brooks, Project Manager IP Nuclear

Leonard M. Trosten, Esquire (Representing Con Ed)

E. Kessig. Acting Manager, Nuclear Power Generation Department

T. Law, Plant Manager

J. M. Makepeace, Director, Technical Engineering

A. Z. Roisman, Counsel for Citizens Committee for Protection

of the Environment (Without Report)

George T. Berry, General Manager and Chief Engineer (PASNY)

2. E. Chilazi, Manager of Projects. Thermal Power Generation (PASNY)

.

.

bec:

IE Mail & Files (For Appropriate Distribution)

Central Files

-

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

REG:I Reading Room

State of New York

Technical Information Center (TIC)

Region Directors (II, III, IV) (Report Only)

A. Z. Roisman, Counsel for Citizens Committee for

Protection of the Environment

,

.

e

l

I

l

.

.