Monthly Operating Repts for Nov 1981
ML20042B023
Person / Time
Site: Turkey Point  
Issue date: 12/15/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20042B021 List:
References
NUDOCS 8203240406
Download: ML20042B023 (8)


Text

,

o i

i

SUMMARY

OF OPERATING EXPERIENCE DOCKET N0, 50-251 UNIT Turkey Point Unit No. 4

~

~ ~ ^

DATE December 15, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552_-_36_66 REPORT MONTH November, 1981 Unit No. 4 remained out of service for scheduled refueling, maintenance and inspection (continued from previous month).

Refer to " Unit Shutdowns and Power Reductions" section of November 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Completed Steam Generator tube inspection.

Completed installation of 32 new fuel assemblies.

1 1

B203240406 811215 PDR ADOCK 05000250 R

PDR

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-250 UNIT Turkey Point Unit No. 3 DATE December 15, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3666 REPORT MONTH November, 1981 Unit No. 3 remained out of service due to Steam Generator Repair program.

Refer to " Unit Shutdowns and Power Reductions" section of November 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional intonnation.

Steam Generator Repair program in progress.

-e

AVERAGE Dtil Y UNIT POhER LEVEL 50-251 DOCKET NO. Tdikey Point UNil UnLt No. 4 DATE Ilereciber 10. 1981 LO\\1PLETE D IlY V. T. Chilson._~

TELEPIIONE (10s) 5s7_1666 November 1981 MONTil DAY AVER AGE DAILY PohER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)

( %1we. Net i 17

~

~

2 18 19

~

3 4

20 5

6 22

~

7

~

23 8

24 9

~

25

~

10

~

26 l1 27 12

~

28 13

~

29 14 30 15 w

16 f

INSTRUCTIONS On this forinat.hst the aveuge daily unit power leselin MWe Net f~or each day in the repiuting inanth. Cinnpute 10 the nearest whole inegawatt.

f 4

pH771

- ed

50-251 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAMETu rkey Point Unit No. 4 DATE nor in 1991 COMPLETED BY. T. Chllson V

REPORT MONTil NOVEMBER 1981 TELEPilONE (305) 552-3666

~.

} E-3 kY Licensee

,Ew Cause & Currective o

No.

Date g

4 jj5 Event 3, '

p Action 1o 3

$E js @ :

Report mV 5

Prevent Recurrence U

u 5.

13 81-01-19 S

720,0 C

4 RC Fueixx Unit No. 4 removed from service for scheduled refueling, maintenance, and inspection. (continued from previous month) (Nuclear and Non-Nuclear Systems) i 2

3 4

F: Forced Reason:

Method:

Exlubit G. instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ll-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LE R) File iNURI.G-D-Regulatory Restriction 9-Other ( Explain) 0161)

E 'perator Training & License Examination F Admmistrative 9,

G-Operational Er ror (lixplain) 6.

A o a o g 4 ve.,..c/

Exhibii 1 - Same Source (9/77)

Il-Ot her ( Explain )

6 a

i I

. i I

A "4

.t e

,a

OPERATING DATA REPORT DOCKET NO. 50-251 DATE nec. 10.1981

~

~

COMPLETED HY v

'r. ch 41 son ~

TELEPilONE (305) 552-3666 OPERATING STATUS 4

1. Unit Name: Turkev Point Unit No. 4 Notes Unit No. 4 removed from November 1981 service for scheduled
2. Reporting Period:

2200 refucling, maintenance, and

3. Licensed Thermal Power (MWt):

760 inspection.(continued from

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 693 Prior month).

680

6. Maximum Dependable Capacity (Gross MWe):

646

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power LevelTo Which Restricted.If Any(Net MWe):

None

10. Reasons For Restrictions,if Any:

This Month Yr to-Date Cumulative 720.0 8016.0 72529.0

11. Hours in Reporting Period 6391.2 53404.0
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 166'.6
14. Hours Generator On.Line 6304.0 51583.0
15. Unit Reserve Shutdown Hours 31.2
16. Gross Thermal Energy Ge'nerated (MWH) 13.779.394 108 145.749
17. Gross Electrical Energy Generated (MWH) 4,400,634 34 373 807
18. Net Electrical Energy Generated (MWH) m4 4,117,109 32',561,129
19. Unit Service Factor 78.6 71.1
20. Unit Availability Factor 78.6 71.2

~ 21. Unit Capacity Factor (Using MDC Net) - 80.7

~69.7

22. Unit Capacity Factor (Using DER Net) - 75.2 69.8

,',23. Unit l'orced Outage Rate

_n_

3.5 3.0

~ ~24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 10, 1981

26. Units in Test, Status (Prior to Commercial Operatioh):

Forecast Achieved.

(

INITIAL CRITICALITY

~

INITIAL ELECTRICITY

~1 COMMERCIAL OPERATION

~

in

. v --met t.

.;, u-

, +.o:,..,

r (y77)

l AVLil AGE DAll Y UNIT POWER LEVEL 50-250 DOCKET NO.

UNil Turkey Point _ Unit 3 DATE December 10, 1981 COMPLETED BY V-T.

ch41enn. _ ~

TELEPIIONE (305) 552-3666 MONTil DAY AVER AGE DAILY P0hER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net i I

17 2

l8 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 ll 27 12 28 13 29 14 30 15 16 e

INSTRUCTIONS On this form't.hst the aserage daily unit power lesel m MWe.Nei for each day in the reporting m..aih. Conipuie to the nearest whole megawatt.

T L

pil77 )

6

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNIT NAME Turkey Point Unit No. 3 DATE Dornehnr 10- 1981 REPORT MONTil NOVEMBER 1981 COMPLETED BY v _ T__

ru l en.,

TELEPHONE (305) 552-3666

~

re

~ 1 2-C f s.0 M Licensee

.Ew h

Cause & Corrective

.5 ?

No.

Date i

58 4

.2 s 5 Event

?

5?

Action to

$E 35g Report =

dE0

?U Present Recurrence e

o C

05 81-06-24 S

720.0 B

4 IIB HTEXCll Unit No. 3 Steam Generator Repair Program in progress. (Continued from (F) previous month) s 1

2 3

4 F: Forced Reason:

Methml:

Exhibit G. Instructions

. S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entr> Sheets l'or Lisensee C Refueling 3 Automatic Scram.

Event Report (LERi File (NUREG-D-Regulatory Restriction 9-Other ( Explain) 0161)

E-Operator Training & License Examination F Administrative 9,

5 G-Operational Error (Explaini 4.

/.o 4.

a ss,ve.,...J Eshibit I Same Source (9/77)

Il-Ot her ( E splain i I

e e

t g

a

OPERATING DATA REPORT DOCKET NO.

50-250 DATE Dec. 10, 1981

~

~

COMPLETED llY V. T. Chilson

~

TELEPHONE (anca ss?-3666 OPERATING STATUS

1. Unit Name: Turkey Point Unit No. 3 Notes Unit No. 3 remained November 1981 out of service due to
2. Reporting Period:

2200 Steam Generator repair

3. Licen.ed Thermal Power (MWr):

760 program (continued from

4. Nameplate Rating (Gross MWe):

Previous month) 693

5. Design Electrical Rating (Net MWe):

680

6. Maximum Dependabli: Capacity (Gross MWe):

646

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power LeselTo Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

.2 This Month Yr to Date Cumulative

11. Hours In Reporting Period 720.0 80160 78801.6
12. Number Of Hours Reactor Was Critical 1459.3 55760.1
13. Reactor Reserve Shutdoim Hours 631.0 844'.4
14. Hours Generator On-Line 1385.6 53891.0
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 3025 277 109 197 555

. 980 415 34 693 625

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

-1410 913 583 32 823 068

19. Unit Senice Factor 17.3 68.4
20. Unit Availability Factor 17.3 68.5
21. Unit Capacity Factor (Using MDC Net) 17.6 64;8
22. Unit Capacity Factor (Using DER Net) ~ '16.4 60.1
23. Unit Forced Outage Rate 52.4 5.1'
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:~

Apvd 0 10R9

26. Units in Test, Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

~1 INITIA L ELECTRICITY COMMERCIA L OPERATION E

f

-(9/77)


t t.

a