o i
i
SUMMARY
OF OPERATING EXPERIENCE DOCKET N0, 50-251 UNIT Turkey Point Unit No. 4
~
~ ~ ^
DATE December 15, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552_-_36_66 REPORT MONTH November, 1981 Unit No. 4 remained out of service for scheduled refueling, maintenance and inspection (continued from previous month).
Refer to " Unit Shutdowns and Power Reductions" section of November 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Completed Steam Generator tube inspection.
Completed installation of 32 new fuel assemblies.
1 1
B203240406 811215 PDR ADOCK 05000250 R
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point Unit No. 3 DATE December 15, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3666 REPORT MONTH November, 1981 Unit No. 3 remained out of service due to Steam Generator Repair program.
Refer to " Unit Shutdowns and Power Reductions" section of November 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional intonnation.
Steam Generator Repair program in progress.
-e
AVERAGE Dtil Y UNIT POhER LEVEL 50-251 DOCKET NO. Tdikey Point UNil UnLt No. 4 DATE Ilereciber 10. 1981 LO\\1PLETE D IlY V. T. Chilson._~
TELEPIIONE (10s) 5s7_1666 November 1981 MONTil DAY AVER AGE DAILY PohER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
( %1we. Net i 17
~
~
2 18 19
~
3 4
20 5
6 22
~
7
~
23 8
24 9
~
25
~
10
~
26 l1 27 12
~
28 13
~
29 14 30 15 w
16 f
INSTRUCTIONS On this forinat.hst the aveuge daily unit power leselin MWe Net f~or each day in the repiuting inanth. Cinnpute 10 the nearest whole inegawatt.
f 4
pH771
- ed
50-251 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAMETu rkey Point Unit No. 4 DATE nor in 1991 COMPLETED BY. T. Chllson V
REPORT MONTil NOVEMBER 1981 TELEPilONE (305) 552-3666
~.
} E-3 kY Licensee
,Ew Cause & Currective o
No.
Date g
4 jj5 Event 3, '
p Action 1o 3
$E js @ :
Report mV 5
Prevent Recurrence U
u 5.
13 81-01-19 S
720,0 C
4 RC Fueixx Unit No. 4 removed from service for scheduled refueling, maintenance, and inspection. (continued from previous month) (Nuclear and Non-Nuclear Systems) i 2
3 4
F: Forced Reason:
Method:
Exlubit G. instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ll-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LE R) File iNURI.G-D-Regulatory Restriction 9-Other ( Explain) 0161)
E 'perator Training & License Examination F Admmistrative 9,
G-Operational Er ror (lixplain) 6.
A o a o g 4 ve.,..c/
Exhibii 1 - Same Source (9/77)
Il-Ot her ( Explain )
6 a
i I
. i I
A "4
.t e
,a
OPERATING DATA REPORT DOCKET NO. 50-251 DATE nec. 10.1981
~
~
COMPLETED HY v
'r. ch 41 son ~
TELEPilONE (305) 552-3666 OPERATING STATUS 4
- 1. Unit Name: Turkev Point Unit No. 4 Notes Unit No. 4 removed from November 1981 service for scheduled
- 2. Reporting Period:
2200 refucling, maintenance, and
- 3. Licensed Thermal Power (MWt):
760 inspection.(continued from
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 693 Prior month).
680
- 6. Maximum Dependable Capacity (Gross MWe):
646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power LevelTo Which Restricted.If Any(Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This Month Yr to-Date Cumulative 720.0 8016.0 72529.0
- 11. Hours in Reporting Period 6391.2 53404.0
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 166'.6
- 14. Hours Generator On.Line 6304.0 51583.0
- 15. Unit Reserve Shutdown Hours 31.2
- 16. Gross Thermal Energy Ge'nerated (MWH) 13.779.394 108 145.749
- 17. Gross Electrical Energy Generated (MWH) 4,400,634 34 373 807
- 18. Net Electrical Energy Generated (MWH) m4 4,117,109 32',561,129
- 19. Unit Service Factor 78.6 71.1
- 20. Unit Availability Factor 78.6 71.2
~ 21. Unit Capacity Factor (Using MDC Net) - 80.7
~69.7
- 22. Unit Capacity Factor (Using DER Net) - 75.2 69.8
,',23. Unit l'orced Outage Rate
_n_
3.5 3.0
~ ~24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
December 10, 1981
- 26. Units in Test, Status (Prior to Commercial Operatioh):
Forecast Achieved.
(
INITIAL CRITICALITY
~
INITIAL ELECTRICITY
~1 COMMERCIAL OPERATION
~
in
. v --met t.
.;, u-
, +.o:,..,
r (y77)
l AVLil AGE DAll Y UNIT POWER LEVEL 50-250 DOCKET NO.
UNil Turkey Point _ Unit 3 DATE December 10, 1981 COMPLETED BY V-T.
ch41enn. _ ~
TELEPIIONE (305) 552-3666 MONTil DAY AVER AGE DAILY P0hER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Net i I
17 2
l8 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 ll 27 12 28 13 29 14 30 15 16 e
INSTRUCTIONS On this form't.hst the aserage daily unit power lesel m MWe.Nei for each day in the reporting m..aih. Conipuie to the nearest whole megawatt.
T L
pil77 )
6
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAME Turkey Point Unit No. 3 DATE Dornehnr 10- 1981 REPORT MONTil NOVEMBER 1981 COMPLETED BY v _ T__
ru l en.,
TELEPHONE (305) 552-3666
~
re
~ 1 2-C f s.0 M Licensee
.Ew h
Cause & Corrective
.5 ?
No.
Date i
58 4
.2 s 5 Event
- ?
5?
Action to
$E 35g Report =
dE0
?U Present Recurrence e
o C
05 81-06-24 S
720.0 B
4 IIB HTEXCll Unit No. 3 Steam Generator Repair Program in progress. (Continued from (F) previous month) s 1
2 3
4 F: Forced Reason:
Methml:
Exhibit G. Instructions
. S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entr> Sheets l'or Lisensee C Refueling 3 Automatic Scram.
Event Report (LERi File (NUREG-D-Regulatory Restriction 9-Other ( Explain) 0161)
E-Operator Training & License Examination F Administrative 9,
5 G-Operational Error (Explaini 4.
/.o 4.
a ss,ve.,...J Eshibit I Same Source (9/77)
Il-Ot her ( E splain i I
e e
t g
a
OPERATING DATA REPORT DOCKET NO.
50-250 DATE Dec. 10, 1981
~
~
COMPLETED llY V. T. Chilson
~
TELEPHONE (anca ss?-3666 OPERATING STATUS
- 1. Unit Name: Turkey Point Unit No. 3 Notes Unit No. 3 remained November 1981 out of service due to
- 2. Reporting Period:
2200 Steam Generator repair
- 3. Licen.ed Thermal Power (MWr):
760 program (continued from
- 4. Nameplate Rating (Gross MWe):
Previous month) 693
- 5. Design Electrical Rating (Net MWe):
680
- 6. Maximum Dependabli: Capacity (Gross MWe):
646
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None
- 9. Power LeselTo Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
.2 This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 720.0 80160 78801.6
- 12. Number Of Hours Reactor Was Critical 1459.3 55760.1
- 13. Reactor Reserve Shutdoim Hours 631.0 844'.4
- 14. Hours Generator On-Line 1385.6 53891.0
- 15. Unit Reserve Shutdown Hours 121.8
- 16. Gross Thermal Energy Generated (MWH) 3025 277 109 197 555
. 980 415 34 693 625
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
-1410 913 583 32 823 068
- 19. Unit Senice Factor 17.3 68.4
- 20. Unit Availability Factor 17.3 68.5
- 21. Unit Capacity Factor (Using MDC Net) 17.6 64;8
- 22. Unit Capacity Factor (Using DER Net) ~ '16.4 60.1
- 23. Unit Forced Outage Rate 52.4 5.1'
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:~
Apvd 0 10R9
- 26. Units in Test, Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
~1 INITIA L ELECTRICITY COMMERCIA L OPERATION E
f
-(9/77)
t t.
a