. OPERATING DATA REPORT DOCKET NO. 50-244 DATE Desember 4, 1981 COMPIR ED BY 64 b r 2. We - w Andrew E. McNamarA TELEPHONE 1 (315) 524-4446 OPERATING STATUS Ext. 205 or 293
- 1. Unit Name:
GINNA STATION, UNIT #1 Notes: The reactor power level was
- 2. Reporting Period: November, 1981 maintained at the 100% level for the
- 3. Licensed Thermal Power (MWt):
1520 majority of the report month, with
- 4. Nameplate Rating (Gross MWe):
490 the excepticn of one outage and two
- 5. Design Electrical Rating (Net MWe): 470 minor power reductions.
- 6. Maximum Dependable Capacity (Gross MWe): 490
- 7. Maximun Dependable Capacity (Net MWe)(: Items Number 3 through 7) Since Last 470
- 8. If Changes Occur in Capacity Ratings R port, Give Reasons:
- 9. Power Level to Which Restricted, If Ag (Net MWe):
- 10. R:acons Fbr Restrictions, If Any:
This Month Yr.-to-Date Cumnulative I'1. Hours In Reporting Period 720 8,016 105,312
- 12. Number of Hours Reactor Was Critical 693.90 6,498.10 80,898.62
- 13. R: actor Reserve Shutdown Hours 0.00 0.00 1,631 32 *
- 14. Hours Generator On-Line 689 75 6,452.00 79,083 63
- 15. Unit Reserve Shutdown Hours 0.00 0.00 8 50 *
- 16. Gross Thermal Energ Generated (MWH) 1,028,280 9,581,448 107,783,650
(
- 17. Gross Electrical Energy Generated (MWH) 337,493 3,126,774 35,066,873
- 18. Nst Electrical Energy Generated (MWH) 321,185 2,y/2,066 J3,227,611 i
- 19. Unit Service Factor 95.80%
80.40%
75.09%
- 20. Unit Availability Factor 95.80%
80.49%
75.10%
> 21. Unit Capacity Factor (Using MDC Net) 94.91%
78.895 69 24%
- 22. Unit Capacity Factor (Using DIR Net) 94.91%
78.89%
69 24%
- 23. Unit Forced Outage Rate 4.20%.
0.61%
8.27%
i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
March 20, 1982 - 60 day outag for modifications, maintenance and refueling.
- 25. If Shutdown At End Of Report Period, H3timated Date Of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C00ERCIAL OPERATION
- Cumnulative total Commencing January 1,1975 8203240330 811207 PDR ADOCK 05000244 R
. AVEAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-244 UNIT #1 Ginna Station DATE December 4,1981 COMPLEfED BY 5_V--,-2. W s_.
Andrew E. McNamara TELEPBGIE 1 (315) 524-4446 Ext. 205 or 293 MCNTH November, 1981 DAY AVHIAGE DAILY POWER LEVEL DAY AVS AGE DAILY POWH1 LEVEL (MWe-Net)
(MWe-Net) 1.
476 17 473 2.
477 18.
473 3
477 19 473 4.
472 20.
4 74 5
474 21.
473 6.
473 22.
473 7.
472 23 473 8.
394 24.
473 9
473 25 473' 10.
473 26.
473 11.
472 27.
474 12.
4 74 28.
474 13 474 29 474 14 450 30.
474 15 142 31.
16.
417 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DOCFFT NO. 50-244 UNIT MAME #1 Ginna Station UNIT SIHH'DOWN AND POWER REDIETIMS IMTE December 4,1981 CmPLETED BY & U_
- S. wrto.
Andrew E. McNesFA REPORT MONTH November,1981 TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 Method of Duration Reason Shutting Licensee Qystem Component Cause & Corrective No.
Ate Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report #
Pmvent Recurrence 81-3 11/14/81 F
30.25 G
1 81-019 AB Instru Accidental Actuation of Fire Suppressim System - Manual Reactor Trip 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions A-B uipment Failure (Explain) 1-Manual for Preparation of Data 8: Scheduled l
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restrictim 4-Other (Explain)
(NTEG-0161) h FeOperator Training & License Examination F-Administrative G-Operational Error (Explain) 5 H-Other(Explain)
Exhibit 1 - Same Source
e
. NARRATIVE SINARY OF OPHIATING EXPHtIHfCE DOCKET NO.
50-244 UNIT Ginna Station, Ihit #1 DATE December 4, 1981 CORPID ED BY & E. h M 9 = -
Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 MutTH November, 1981 The reactor r level averaged 100% until 11/8/81 when it was reduced to approximately 4 to perform a series of turbine valve and trip tests.
The power level was restored to 100% and ramained at that level until 11/14/81.
On that date a manual reactor trip took the ur_tt out of service. This manual reactor trip was due to an accidental actuation of the fire suppression system.
'Jhe unit was returned to service on 11/15/b1 and the power level was maintained at 100% for the remainder of the report month, the excepticn being a reduction to approximately 98% on 11/23/81 to perform peri xiic tests on the auxiliary feedwater system.
I l
l
r
, GINNA STATION Maintenance Report November, 1981 During November routine inspections and maintenance were performed. Major safety related maintenance included:
1.
Replacement of a low level insertion limit bistable.
2.
Replacement of a supply breaker for a safety injectim plump with a dual feed, after the breaker failed to operate properly.
3 Cleaning and drying out of numerous connectims on the nuclear instrunentation system, after numerous fire system water suppression systems were accidentally actuated.
4.
Cleaning of a containment spray pump discharge check valve after it failed to close quickly during testing.
5 Repair of a pinhole leak, probably caused by a casting imperfectim, cm a steem generator blowdown containment isolation valve.
l
$