e VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-05 FOR THE MONTH OF MAY, 1981' e
D 4
s 8203240iB9 810610 PDR ADOCK 05000271 R
OPERATING DATA REPORT i
DOCKET NO, 50-271 DATE 810608 j
COMPLETED BY F.J. Burrer l
TELEPH0EE (802)257-7711
Ext. 137 OPERATING STATUS Notes
- 1. Unit Name:
vermont Ynnkee
- 2. R: porting Period:
May 1981
- 3. Licensed Thermal Power (MWt):
1593
- 4. Nam: plate Rating (Gross MWe):
san
- 5. D; sign Electrical Rating (Net MWe): 514(ooen)504(closed L
- 6. Maximum Dependable Capacity (Gross MWe):
535
- 7. Maximum Dependable Capacity (Net MWe):
soc
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Powsr -Level to Which Restricted,If Any(Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 3,623.00 R2. Number Of Hours Reactor Was Critical 711.12 3,590.12 61,125.90
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 94. Hours Generator On-Line 702,45 3,532.05 59,133.63
- 05. Unit Reserve Shutdown Hours 0,00 0.00 0.00
- 6. Gross Thermal Energy Generated (MWH) 1.081.345,00 5,391,827.50 83,995,344.50
- 17. Gross Electrical Energy Generated (MWH) 359.053.00 1.821.740.00 27.934.587.00
- 28. Net Electrical Energy Generated (MWH) 340.123.00 1.743.861.00 26,491,440.00
- 19. Unit Service Factor 94.42 97.49 77.60
- 20. Unit Availability Factor 94.42 97.49 77.60
- 21. Unit Capacity Factor (Using MDC Net) 90.71 95.50 68.98
- 22. Unit Capacity Factor (Using DER Net) 88.94 93.64 67.64
- 23. Unit Forced Outage Rate s.sR
- 2. 51 7.04
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
.Refueline outane scheduled to start October 24. 1981 and continue for six weeks.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermo$tYankee DATE 810608 COMPLETED BY F.J. Burger TELEPHONE (802) 257-7711 Ext. 137 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
slo 17.
483 2.
520 18.
495 3.
511 19.
496 4.
519 20.
496 5.
519 21.
495 6.
518 22.
494 7.
519 23.
493 8.
519 24.
485 9.
518 25.
490 10.
465 2 6.,.
488 11.
204 27.
487 12.
0 28.
487 13.
272 29.
487 14.
386 30.
414 15.
457 31.
461 16.
474 INSTRUCTIONS:
.'On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l I
m
~
DOCKET NO 50-271 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Vermont Yankee
~~
REPORT MONTH May COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 137 1 of 2 pages E '2 y
Cause & Corrective m
o o
No.
Date g
gg g
gu License 9
Rep rt#
0
'O e
c1 54 em m
o g
O e
61-09 810511 F
41.55 G
3 N/A IA INSTRU While performing maintenance on the manual scram relay of SRM channel "D",
the close proximity of Lrth RPS power supplies, due to circuit redundancy, permitted a short between relay contacts that blev both manual scram circuit fuses and tripped the plant. Management elected to perform other maintenance at this time that extended the duration'of the outage.
81-10 810517 S
0 B
4 N/A HA TURBIN Power reduction for turbine generator (Power surveillance.
Reduc-tion)
F: Forced Reason:
Method:
Exhibit G-Ih"structions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain) 7/80
~
UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 810608 REPORT MONTil May COMPLETED BY F.J. Burger TELEP110NE (802)257-7711 Ext. 137 2 of 2 pages m
@Q oy$
Cause & Corrective n
License No.
Date j
j y g
ygg ye Action to Event dS
.g g g 8.
Prevent Recurrence gv y
g g ce Report #
Nu a
gu x
g u
S 81-11 810530 F
0 B
4 N/A ZZ ZZZZZ Power reduction to investigate increasing (Power reactor vessel conductivity.
Reduc-tion)
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain)
'l-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee B-Haintenance or Test C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREC 0161)
E-Operator Training & License Examination 5
F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
Il-Other (Explain)
"T f O ri
DOCKET NO.
50-271 UNIT Vermont Ycnkee DATE 810608 COMPLETED BY F.J. Eurger TELEPHONE (802)257-7711 Ext. 137 SAFETY RELATED MAINTENANCE 1 of 3 pages NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RWCU Valve V12-19B Corrective N/A Worn Seal Ring Leakage Replaced Seal Ring MR 81-0052 "C"
RilR Service Water Preventive N/A Worn Parts Back Flow Replaced Worn Parts Pump Discharge Check Valve MR 81-0184 V70-38A llCU 22-43 Upper Solenoid Corrective N/A Worn Parts Noisy Replaced Parts as MR 81-0459 Necessary "A" Emergency Diesel Gen.
Corrective LER Failed Gasket Leakage Replaced Gasket
- 12 Cylinder Cooling Water MR 81-0482 81-14/3L Piping Elbow RWCU 1" x 3/4" Reducing Corrective LER Unknown Through Wall Replaced Fitting Fitting on lleat Exchanger MR 81-0541 81-11/3L Leakage E15-1A RWCU Valve V12-41A Corrective N/A Worn Packing Leakage Adjusted Packing MR 81-554 RWCU lleat Exchanger E15-1B Corrective N/A Failed Gasket Leakage Repaired by Furmanite MR 81-0556 SRM Channel "D" Scram Relay Corrective N/A Aging of Components Relay Hot To The Replaced Parts as MR 81-0558 Touch and Necessary Odoriferous
DOCKET NO.
50-271 UNIT Vermont Yrukee DATE 810608 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 137 SAFETY RELATED MAINTENANCE 2 of 3 pag 6s NATURE OF MALFUNCTION LER OR OUTACE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "A"
UPS Corrective N/A Failed Components Systen Grounded Repaired as Necessary 101 81-0560 (Plant in Cold S/D)
Shock Suppressor MS-32 Corrective LER Failed Components,
Fluid Leakage Rebuilt Snubber MR 81-0561 81-12/3L Shock Suppressor RR-63 Corrective N/A Defective Vent Apparent Visual Replaced Vent Plug MR 81-05ti2 Plug Inspection Failure (Snubber was operabic)
RilR Service Water Preventive N/A-Failed Mechanical Leakage Replaced Seal Pump P8-lC HR 81 'J569 Seal Reactor Protection System Corrective N/A Failed Components Instruments Replaced Power Supply Power Supply PS-25-6A-B2 MR 81-0614 Inop.
f Reactor Protection System Corrective N/A Failed Components Instruments Replaced Power Supply Power Supply PS-25-5A-Al MR 81-0623 Inop.
- Corrective N/A Loose Bolting Leakage Tightened Bolting MR 81-0629 RllR Service Water Corrective LER Faulty Breaker Breaker Tripped Replaced Breaker Pump P8-1B ACB MR 81-0640 81-15/3L During Surveil-lance Testing
DOCKET NO.
50-271 UNIT Vermont Ycnkt.e o
DATE 810608 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 137 SAFETY RELATED MAINTENANCE 3 of 3 pages NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "B" RWCU Demineralizer Corrective N/A System Operation Trap Plugged Replaced Trap Basket Resin Trap MR 81-0645
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 810608 COMPLETED BY F.J. Burger TELEPHONE 802-257-7711 Ext. 137 REPORT MONTH May
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 91.2% of rated thermal power for the month.
Gross electrical generation was 359,053 MWH, or 89.4% of design electrical capacity.
Operating Summary The followinF 's a chronological description of plant operations including other pertinent items of interest for the month:
5/1/81 At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power.
5/11/81 At 1002 hrs, the reactor scrammed because of a blown fuse in the Reactor Protection System.
5/12/81 At 1740 hrs. a reactor startup was initicted, the reactor was critical at 1855 hrs.
5/13/81 At 0335 hrs. the turbine was phased onto the grid.
5/14/81 At 1400 hrs. the plant went on closed cycle cooling.
5/17/81 At 0100 hrs. power was reduced for turbine surveillcnce.
5/17/81 At 0300 hrs, a return to full power was initiated.
5/30/81 At 1035 hrs. a power reduction was initiated to investigate high reactor vessel conductivity.
Turbine and control rod surveillance were done at this time.
5/31/81 At 0245 hrs. a return to full power was initiated.
5/31/81 At the end of the reporting period the reactor was operating at 99.8% of rated thermal power.