UN11ED STATES
(
'
'
NUCLEAR REGULATORY COMMISSION
,
REClON I
$35 PARK AVENUE
h
p
h
KING of PRUSSI A. PCNNSYL.VANI A 19406
.
License Nos. DPR-5
Consolidated Edison Company of
New York, Inc.
,
Attention:
Mr. W. J. Cahill, Jr.
Inspection Nos. 76-03
76-05
i
Vice President
'
Docket Nos. 50-03
4 Irving Place
'
Centlemen:
'
f
This refers to the inspection conducted by Mr. D. .Neely of this office
on March 16-19, 1976 at Buchanan, New York of activities authorized by
NRC License Hos. DPR-5 and DPR-26 and to the discussions of our findings
held by Mr. D. Neely with Mr. Stein and other members of your staff at
[
the conclusion of the inspection.
.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
' letter.
Within these areas, the inspection consisted of selective
examinations of. procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the
items of noncompliance brought to your attention in a letter dated
JanLary 23, 1976. We have no f'urther questions regarding your action at
this time.
Based on the results of this inspection, it appears that one of your
. activities was not conducted in full compliance with NRC requiremants,
as set forth in the notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categori::ed into the levels
as described in our correspondence to you dated December 31, 1974. This
notice is se.nt to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results achieved; (2) corrective
steps which will be taken to. avoid further items of noncompliance; and
(3) the date when full compliance will be achieved.
otuTro,
.'OlQ5
i
$
? [('M.;/
9
%
cw
!
rdb324'0062 760520
PDR ADOCK 05000003
-
O
.
-
._ _.
.
.
.
I
/
e
.
Consolidated Edison Company of New York, Inc.
.
-2-
,
.
We note that the notice referred to in Appendices A and B were posted
,
during the inspection. Therefore, in your reply you need only state
!
corrective steps which will be taken to prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
>
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information,
.'
which identifies the docu=ent or part sought to be withheld, and which
contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subpara-
graph (b)(4) of Section 2.790.
The information sought t.o be withheld
shall be incorporated as far as possible into a separate part of the
,
If we do not hear from you in this regard within the
j
specified period, the report will be placed in the Public Document Room.
Shou'ld you have any questions concerning this inspection, vc will b'e
f
pleased to discuss them with you.
l
Sincerely,
.
=
J
,
Paul R. Nelson, Chief
Fuel Facility and Materials Safety
Branch
-
,
Enclosures:
1.
IE Inspection Reports No. 50-03/76-03 and
,
50-247/76-05
2.
Appendix A, Notice of Violation (DPR-5)
3.
Appendix B, notice of violation (DPR-26)
-
.
.
e
l
l
l
-
i
.
l
_ . _ .
. _ _ . .
~. -
-
_
_.
. _
,_
. . _ .
._
.. .
- - -
4
...
.
.
.*
.
l
'
i
!
!
.
.
.
,
'
Consolidated Edison Company of New York, Inc.
,
23_
.
-
a.w -
,
j.
)
cc:
W. Stein, Manager, Nuclear Power Generation Department
S. Salay, Plant Manager
A. E. Upton, Esquire
!
J. M. Makepeace, Director, Technical Engineering
!,
A. Z. Roisman, Counsel for Citizens Committee for
i
Protection'of the Environment (Wit,hout Report)
.
j
!
i
bec:
'
IE 5: ail & Files (For Appropriate Distribution)
l
Central Files
-
,
Public Document Room (PDR)
Local Public Document Roca (LPDR)
Nuclear Safety Information Center (NSIC)
l
Technical Information Center (TIC)
REG:1 Reading Room
i
Region Directors (II, III, IV) (Report Only)
{
State of ::cw York
'
'
A. Z. Roistan, Counsel for Citizens Cocaittee for
l
Protection of the Environment
,
!
.
.
i
$
i
-
l
.
(
a
.
I
f
l
l
!
.
-%r..-.
- - -
-
-
m.
-
- + . - - , _ . .
e
, , - - - _ _ .
_.m,,
. . ,-.-w
,