Forwards IE Insp Repts 50-295/82-01 & 50-304/82-01 on 811211-12,18 & 820107.No Noncompliance Noted
ML20042A376
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/04/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20042A377 List:
References
NUDOCS 8203230371
Download: ML20042A376 (2)


See also: IR 05000295/1982001

Text

,

.

MAR

4 W2

ELL)W

s

Docket No. 50-295

2

D

Docket No. 50-304

S

D

w

-c*

g

CommonweaIth Edison Company

C? 2 2 232'> I

ATTN:

Mr. Cordell Reed

, '

}dh * NN* [7

-

nr m i""J a m

J

Vice President

Post Office Box 767

N

Chicago, IL 60690

9-

g

Gentlemen:

This refers to the special safety inspection conducted by Messrs.

K. Connaughton and M. Gildner of this office on December 11, 12, 18, 1981

and January 7,1982, of activities at Zion Nuclear Power Station, Units 1

and 2, authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48 and

to the discussion of our findings with E. Fuerst and G. Pliml at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection and addresses the Confirmation of Action Letter issued by this

office on December 11, 1981. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

As a result of a telephone conversation between Messrs. J. Peschel and

l

K. Graesser of our respective staffs on December 22, 1981, it is our under-

!

standing that you are planning to perform modifications, similar to those

'

applied to the 2B and 2C auxiliary feedwater pump control circuits, on the

l

1B and 1C auxiliary feedwater pump control circuits. These modifications

!

are to be performed at the next scheduled refueling outage on Unit 1, or

l

within the LC0 time limitations for operating with the 1A turbine driven

feedwater pump out of service and one motor driven auxiliary feedwater pump

assumed inoperable, whichever occurs first. Appropriate testing will be

performed to determine applicability and adequacy of these modifications.

Also it is our understanding that during the next scheduled refueling

outages of Units 1 and 2, control circuits affected by modifications

M22-1/2-80-24 will be modified to permanently resolve the breaker reset

problem resulting from rapid control switch manipulation.

820323037i [ h 5

PDR ADOCK

pDR

.

.

Commonwealth Edison Company

-2-

MG

4 1982

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

,

NRC's-Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your. receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab--

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be. withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

i

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

i

We will gladly discuss any questions you have concerning this inspection.

i

Sincerely,

I

It.-Iginni SIF4d by C.M.1.'ordI6

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosure:

Inspection

Reports No. 50-295/82-01(DETP)

and No. 50-304/82-01(DETP)

cc w/ enc 1:

Louis 0. DelGeorge, Director

of Nuclear Licensing

K. L. Graesser, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

(

Mary Jo Murray, Office of

l

Assistant Attorney General

[

Mayor John B. Spencer

l

City of' Zion

RIII

RIII

RIII

Co#1C

h gc el

W{

lla#

RII

fIII

RIII

nnaugnton/so