ML20042A186
| ML20042A186 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/08/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20042A187 | List: |
| References | |
| NUDOCS 8203230185 | |
| Download: ML20042A186 (2) | |
See also: IR 05000445/1982001
Text
,
',
NN
In Reply Refer To:
Dockets: 50-445/82-01
G
4
50-446/82-01
RECC4ygg #
AOO 21982A
Texas Utilities Generating Company
g
,
ATTH: Mr. R. J. Gary, Executive Vice
ar$%um
'
a
,)
$fWuu
President and General Manager
8-
2001 Bryan Tower
Dallas Texas
75201
4
g
Gentlemen:
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. R. G. Taylor, during January 1982, of activities authorized by NRC Con-
struction Permits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units
1 and 2, and to the discussion of our findings with Mr. R. G. Tolson and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspr.ction report. Within these areas, the inspection consisted of
selective exrmination of procedures and representative records, interviews with
a
personnel, and observations by the inspector.
Within the scope of the inspection, no violations were identified.
Three new unresolved items disclosed durins the inspection are discussed in
paragraphs 5 and 7.
In accordance with 10 CFR 2./90(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document eloom unless you notify this office,
by telephone, within 10 d es of the date of this letter and submit written
application to withhold information contained therein within 30 des of the
date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1).
820323o18s 820308
DR ADOCK 05000
.RRS.A.
. REB 4 W .
.DRRPhP..
[
. DRA. .
..
.RA/RI.V
. .RPS. A .
=
.
.
Tay. lor /dm. .WCrnssma
,. .GLMadsen. .
.JSagI rdo.
. KVSey.fri.t.
.JICall.iTs'.
"^
.
. /1B/82.
.2/17./82..g,$.2/17./82.
.2/}{/82...
. 2/23 /82. . . .
. 3/g/82.
.
NRC FORM 318 0080) NRCMONO
'
OFFICIAL RECORD COPY
,
_.
_ - _ _ _ _
_ _ _ _ _ _ _ _ _ _ - _ _ _ _
- .
,
Texas Utilities Generating Company
-2-
4 g g g 1992
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
r Origin 31 TSnod D'!
n. c. r t " . ' '
G. L. Madsen, Chief
)
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection
l
'
Report No. 50-445/82-01
50-446/82-01
cc w/ enclosure:
Texas Utilities Generating Company
ATTH: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
bec w/ enclosure:
bcctoDMB(IE01):
bec distrib, by RIV:
R. Taylor, SRI
D. L. Kelley, SRI
AE00
T. F. Westerman, RPS-A
l
ELD
TIB
l
IE File
EIB
IE/RPRIB
Texas Dept. Health Resources
l
NRR/DHFS
Juanita Ellis
NRR/0LB
Geoffrey M. Gay
'
RAD ASMT BR
Richard W Lowerre, Esq.
RESEARCH
Richard Fouke
PDR:HQ
J. T. Collins, RA
LPDR
C. Wisner, PA0
RIV FILL
i
l
l
"'c'>
.
.
.
.
. ..
""'"'>
.
..
.. . .
.
.
.
.
. .
DATEf
.
. .. .
.
.
.
....
. .
.
. .
.
.
.
.
""""*""'""C"
OFFICIAL RECORD COPY