g 'Q,o,
UNITED STATES
y
NUCLEAR REGULATORY COMMISSION
{3
E
REGION 111
5
C
o
799 ROOSEVELT HOAD
GLEN ELLYN,ILtlNOIS 60137
.....
FEB 2 6 1982
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
A'ITN :
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
N. J. Chrissotimos and S. G. DuPont of this office on January 9 through
February 22, 1982, of activities at Quad-Cities N'iclear Power Station,
Units 1 and 2, authorized by NRC Operating License No. DPR-29 anc' ':-- DPR-30
and to the discussion of our findings with Mr. N. J. Kalivianakis
the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative reco~ds, observations, and in-
r
torviews 71th personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this of fice
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are availabic for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
8203230001 820226
PDR ADOCK 05000254
-
G
'-
SNI
.cGol
.
.
.
Commonwealth Edison Company
2
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
NNgInalsigned by R.L. Spessare8
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection
Reports No. 50-254/82-03(DPRP)
and No. 50-265/82-03(DPRP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary'Jo Murray, Office of
Assistant Attorney General
RIII
RIIL -
RIII
&gRU
(Lf-
Walker /so
Knop
Sp
ard
2/25/82
M gg
,
, - _ _ . .