Forwards Request for Addl Info Re Facility ASME Code XI & Tech Spec Inservice Insp Requirements to Facilitate Review of First 10-yr Inservice Insp.Info Should Be Submitted within 30 Days of Receipt of Ltr
ML20041G535
Person / Time
Site: Point Beach  
Issue date: 03/12/1982
From: Clark R
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8203220483
Download: ML20041G535 (4)


Text

. -.

8 e

~

DC3 M90 b i

MAR 12 BB2 DISLRIBUTION:

t 41ock_et Tflp DChaney NRC P W GJohnson L PDR Gray File Docket Hos. 50-266 and 50-301 3 Rdg to DEisenhut 4

D i

JHeltemes d

f1r. C. W. Fay ACRS-10 C

i Assistant Vice President 1

I&E IN Wisconsin Electric Power Company 0 ELD 231 West Michigan Street tzer-e,2}

W l 3 O' t,8 fCo k,, Q "n q:j Milwaukee, Wisconsin 53201 RAClark V

T

Dear Mr. Fay:

/7'6Ty N, N /

j We have received your' February 23, 1982 letter reporti 1c mpi tion of thefirstten-yearinserviceinspectionintervalforPointDeachNuclear Plant, Unit 1.

In enclosure 4 of your letter, you identified certain ASME Code XI and Technical Specification inservice inspection requirements not met during this first ten-year interval inspection for Unit 1.

These devia-tions to the requirements are under review by the NRC staff.

Your letter also requests interim approval of your Technical Specification Change Request No. 42, submitted to the NRC on February 17, 1977, unless the NRC staff's review is scheduled for completion "in the very near future."

Our present plans are to complete this review for your facilities by August 1982. Discussions with members of your staff indicate that this is acceptable and interim approval of your proposed Technical Specification 15.4.2.B.1 would not be required if the above target date is met.

In reviewing your responses we have found that we will need additional infor-mation identified in the enclosure to facilitate our review.

In order for us to maintain our review schedule, your response is requested within 30 days receipt of this letter.

Please send a copy of your response directly to our contractor: Dr. D. R.

Outlaw, Science Applications-Inc., 1710 Goodridge Drive, McLean, Virginia l

22102.

The reporting requirements contained in this letter affect fewer than ten respondents; therefore, 0?iB clearance is not required under P.L.96-511.

Sincerely, Original signed by Robert A. Clark Robert A. Clark, Chi f 8203220483 820312 Operating Reactors Branch #3 PDR ADOCK 05000266 Division of Licensing G

PDR

Enclosure:

As stated j

cc: See next page ornce>.QRB,f,p,,:,0,,,,,,0R,B,(3,;D([ ORBf3,:0,L@

mme >.PEhM,,z,er,,,,

.I@,,1,,bu,rn,/,p,n, RA g,

,,,,,,,,,,,,,,[

.3/.GM........3/lhg,2,,,,,,,,

3/,},eg,@2,,,

I omy nne rORM 318 00-80) NRCM 0240 OFF1ClAL RECORD COPY usam nu--mm :

Wisconsin Electric Power Company cc:

Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.

6612 Nuclear Road Washington, D. C.

20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 "r. Glenn A. Reed, Manager Nuclear Ocerations Wisconsin Electric Power Company

- Point Beacn Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade lia N. Carroll Street.

Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Regic-V Cffice ATTN:

Regional Radiation Representative 230 S. Dearborn Street Chicago, Illinois 60600 Chairman 2;r'ic Service Commission cf Wisconsin

^

Hills Farms State Office Building Madison, Wisconsin 53702 Regional Acministrator

~ j Nuclear Regulatory Commission, Regien III J

Office cf Executive Director for Operations 799 Roosevel: head Glen Ellyn, Illinois 50137 e

mm m.

m

.a

c, nU,j l 1 U...,iW.

je.,.-,.........,

- - h. b iV -

TUK

. UN tra l 1 Ui K:

b

. I h. - - < y,, -

3., g o..r.,0,,, -.r,,...

e e u,mn.

. ::.n:

.u2.

Point Beach 1 and 2 As referenced below, a number of submittals have been made by Wisconsin Electric on ISI. -In order to complete review of the relief requests for ISI'for the interval through December 1981 for Unit 1, and August 1982 for

n. 4... 9 ( :.. :

..s m..,, a. s..-.,. -

.a..

.,,.,,e.

.....e

,,. c.

,,,.... e. g.

oc..

4

:a "..* *. F.-l c' *.* : '.. '.

.C. "e a '. ' c. '.'*.(.

i. r c n ". c..'. '.' c. d.

." n.

I. i r..:.. :. r... t.

w r ference 10: "50i;ing v.iil no: Os cisassemblec #cr the scie Yca s: ate in e

Ourocse Cf exa.ina:icn, but l,. remcvec icr s me c:ner reason 1; will :e exam-i r.e d. " Are you examinir. :ne Dol-irg in piece, as per-i :Ed by :ne cocs? Based u;cn Ine incustry exoerience, wna is ne likelihood that.iese cumps wcuic not te cisassembled fcr maintenance curing the interve'i?

actor Coolant rumos umo Casine

,n' elds (Item ::.o c tecorv :,,.

r ma c

ne Are ycu proceeding to inspect these ;um; casing v.elcs using the miraature

..:.,c.-,..,,.

n....... - s 4

.c. a c.,... e,

.n :.:.:.

.,...m c. ;.c a, w. e.c

_c o. r.

i. 2 -ur a.ie.c..

...n,

.:.r

..v..e.

-. c. r.. e.

v.a.. r. s

a. e.

,n..,a.,..=..

- - +,

e.., -
e. s e.,

.=

e 2.

Eurstein (WE';

c Ruscne WR"). Tecn. 5:ec.

r.ange hc.

'2, Lni: 1 fcr ISI.

February 17, 1977.

... c.... e s..

.e. -. :...-.: -

.t.-..

,:...c.'. :..
.. e.u. e, c

.a.ct.

f... :. r. '

Lear (h. C3, tc =urstein 0::), -, c.. en

,.r. i t.

'.: v,.,

. c..

..an anc eile r.

.,.,., n.:.e.

escense te e/ /n nn,:-Uni:

1, Oc:cber.,.,-.

rstein (h.-) to, ear (h. C.), n c

a

ee zu w

n

(

5.

Senwencer (NRC :o Eurstein (WE), Adcitional RAI on 5/20/77 Olan anc 10/6/77

-es:cnse - e.

.n:

1. ouc,:.

.:.c.

6.

-esconse to e/. //: nn i uni:

1.

2c i

I I

l I

I

J i

7.

Eurstein (WE) to Denton (NRC), Tech. Soec. Chance No. 58. Unit 2 for ISI, 4

Novemoer 27, 1978. -

2 S.

Schwencer (NRC) to Burstein (WE), Additional:RAI on 5/20/77 Plan - Unit 1, December 4,1978.

9.

Burstein (WE) to Schwencer (NRC), Resoonse to 12/4/78 RAI - Unit 1, February 6, 1979.

20.

Surstein (UE) to Denton (NRC), ISI Plan for Unit 2.

February 26, 1979.

I:.e.:er 'NEC) to Earste' t':E':. R1: :

J if 2. Re:.est f r U its 1 an; I

52 crograms to be ccabined, October 4, 1979.

12.

Fay (WE) to Den on (NRC), Resconse to 10/4/79 RAI on Unit 2. December 4, 1979.

12.

Fay (UE) to Denton (NRC), Plans to Submit Second IC-Year ISI Clans for Units 1 anc 2, October 6, 1951.

4 Fay (WE) to Denton (NRC), Plans to Inscect Cociant Pumo Weids, Octcber 6, 1981.