ML20041G457
| ML20041G457 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/05/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-20319-GHD, DER-81-44, NUDOCS 8203220329 | |
| Download: ML20041G457 (2) | |
Text
'
Docket Nos. 50-528/529/530
,Jyts 50 55(e) Report
,.. f.
{
Nb$h bINNbb bbbMN P. O. Box 216 6 6 PHOENIX, ARIZON A 85036 March 5, 1982 ANPP-20319-GIID/BSK U. S. Nuclear Regulatory Commission Region V
~
Creekside Oaks Office Park
'14 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 3
.p my*
o m
Q@$
Attention:
Mr. B.11. Faulkenberry, Chief g,
O Reactor Construction and U,
Engineering Support Branch
. '.h
-3
.]
,e c:-
Subject:
Time Extension for Report - DER 81-44 1
A 50.55(e) Potentially Reportable Deficiency Relating
^5-to Fisher Pressure-Regulating Valves Supplied by Combustion Engineering Do Not Meet Design Pressure Requirement on Downstream Side File: 82-019-026 D.4.33.2 S:a
't
Reference:
(A) Telephone Conversation between J. Eckhardt and g
G. Duckworth on November 23, 1981 Q
I?Ecgyp,
T3
[ zygYWY W44 (B) ANPP-19769, dated December 23,1981 (Interim Report) 9
Dear Sir:
G The NRC was notified of a potentially reportable deficiency in Refer (A) and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by March 4, 1982.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 4, 1982, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly
- rir, e c' C
C ctu n t.a ex E. E. Van Brunt, Jr.
go APS Vice President mo Nuclear Projects 20 ANPP Project Director o
0*%
EEVBJr/CllD:ske b
00 Enclosure N <t cc:
See Attached Page 2 g;
Qg gl-o /
ma mam
U. S. Nuclear Regulatory Commission Attention:
Mr. B. H. Faulkenberry, Chief ANPP-20319-Gild /BSK March 5, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognir' F. W. Ilartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee llourihan 6413 South 26th Street Phoenix, Arizona 85040 l
l s
l l
l 1
l
.. -