Monthly Operating Repts for Feb 1982
ML20041G141
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20041G137 List:
References
NUDOCS 8203190313
Download: ML20041G141 (17)


Text

_ _

OPERATING DATA REPORT DOCKET NO. 50-269 DATE 3/15/82 COh!PLETED BY J. A. Reavis TELEPHONE 7nA 171 R552 OPERATING STATUS Oconee #1 Notes

1. Unit Name:

February, 1982 Year-to-date and cummulative

2. Reporting Period:

capacity factors are calcu-

3. Licensed ThennaJ Power ()!We): 2568 lated using a weighted
4. Nameplate Rating (Gross $1Wei: 934 average for maximum 5.< Design Electrical Rating (Net StWe): 886 a e 8 Pac W .
6. Staximum Dependable Capacity (Gross 5twe): 899
7. Staximum Dependable Capacity (Net 31We): 860
3. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Ressons:
9. Power Level To Which Restricted. If Any (Net StWe):
10. Ressons For Restrictions. !f Any:

This 31onth Yr..to Date Cumulative

11. Hours In Reportmg Period 672.0 1 416.0 75 601.0
12. Number Of Hours Reactor Was Critical 276.6 449.7 51 505.0
13. Reactor Reserve Shutdown Hours - - -
14. Hours Generator On Line 222.6 335.5 48 578.7
15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energy Genersted t.\tWH) 496 209 629 251 114 087 023 I? Gross Electrical Energy Generated tatWH) 165 060 _,

204 820 39 681 170

13. Net Electrical Energy Genersted (StWH) 147 840 171 'll 17 s1s ano
19. Umt Service Factor 33.1 23.7 64.3
20. Umt Availability Factor 33.1 23.7 64.3
21. Umt Capacity Factor (Using .\tDC Net) 25.6 14.1 57.5
22. Unit Capacity Factor iU>ing DER Net) 24.8 13.7 56.0
23. Unit Forced Outage Rate 65.2 75.8 19.5
24. Shutdowns Scheduled Over Next o .\tonths (Type. Date.and Duration of Eacni:

None

25. If Shut Down .\t End Of Report Penod. Estimated Date of ',::rtup:
26. Umts in Test Status t Pnor to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COSINtERCIA L OPER A TION 8203190313 820315 PDR ADOCK 05000269 R PDR e i,- -,

DOCKET NO.

50-269 -

Unit'SiluTDOWNS AND POWl:R REDUCllONS UNil NA%IE Oconee 1 DATE 3/15/82 -

February, 1982 CONIPLETED Hy J.A. Reavis

!!!~POlt1 AIONTil TELEPilONE(704)373-8552 "k -

L.

-, 5E 3 h"k jgy

$ l icensee ,El  % Cause & C usective Date y, 3g i Eveni sy $3 Auitui su

$E E j@g itepori e di0 y Prevent llecurrence 5

2-p 82-02-01 F --

A --

CH PIPEXX Reduced to 55% power to secure "A" feed-water pump for repair of a leak in the recirculation line.

8 82-02-01 F 31.80 A 1 HA TURBIN Turbine off for a -balance shot. Reactor remained critical.

9 82-02-09 F 417.65 A 1 CB HTEXCH Removed unit from service to repair tubt leak in the lA steam generator.

I 2 3 4 1: 1;uced Itcaum: hlctimd: Exhibit C-Instructions S. Sheduletl A liituipment l'ailure (laplain) 141anual for Preparation of Data ll %laintenance or Test 2 Alanual Scram, lintry Sheets l'or 1.ieensee C-Itefueling 1 Aufonutic Sciam. lisen Repos (1. Lit!I?ile int!Iti:G.

D Itegulatory itestsiction 4 Other (lixplain) 01bli l'-Ope.ator Training & License lixamin.ition 12-Ad minist rative 5 G Opeiational 1:iror (lisplain) Eshibit I-Same Source 19/77) ll Other ( Explain)

L- _

, AVERACE D AILY UNIT ?OWER LEVEL DCCKET NO. 50-269 UNIT Oconee 1 '

DATE 3/15/82 CONtPLEND BY J. A. Reavis TELEPHONE (704)373-8552 St0 NTH February, 1982 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY ?OWER :.IVEL (3the-Net s i3;we Neri l

404 _

13 __.

3 355 _

39 4 636 -

20 5

675 _

3 6 828 ,, _

7 863 g 3 864 3 _

9 425 _

3 10 :S -

11 -

- 576 12 3 859

.9 I4 30 15 31 16

!NSTRUCTICNS Cn t'.:s fer: :t. Ust :..e 2.er:ge :t!y 2.;:  ; ;wer e.e .., ,la.ve . Net:

ese,., .:., . .,,.. .,...

7;. . "." "." ', , , '

  • .: .".42 rest . nete . .e;;w::-

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Oconee Unit 1 .
2. Scheduled nex: refueling snutdevn: March, 1983
3. Scheduled res: art following refueling: May, 1983 4

Will refueling or resumption of operation thereaf ter require a =cchnical

+

specification change or other license amend =ent? Yes .

If yes, what vill thes'e be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Co=mittee regarding unreviewed safety questions? N/A ,

If no, when is review scheduled? N/A .

5. Scheduled date(s) cor submitting proposed licensing action and supporr.ing information: Submitted February, 1983 ,
6. I=portant licensing considerations (new or dif ferent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1

7. Nu=ber of fuel assemblies (a) in the core: 177 .

(b) in the spen fuel pool: 769 ,

3. Present licensed fuel peol capacity: 1312
  • Size of requested or planned increase: .
9. Projec:2d data of las refueling which can be acco==odated by presen:

licensed capacity: ,

CLIZ PCWEF. COMPAlnf Oc:e: March 15, 1982

'a=e of Can:act: J. A. Reavis

    • cpresents the total for the combined Units 1 and 2.

DOCKET NO: 50-269 UNIT: Oconee 1 DATE: March 15, 1982 NARRATIVE

SUMMARY

4 MONTH: February, 1982 Oconee 1 began the month at 67% power and increasing following an outage for a turbine balance shot. The power increase was stopped at 75% and reduced to 55% to remove the "A" feedwater pump from service for a leak repair in the FRP recirculation-line.

At 1842 on February'1, the turbine / generator was removed from service due to the high vibration on the #3 turbine bearing. A balance shot was placed and the unit returned to service-on February 3 at 0230 and increased in power reaching 100% power on February 6 at-1801.

The unit was removed from service on February 9 at 1418 to repair a tube leak in the 1-A steam generator. Repairs were completed and the unit returned ' to service on February 26 at 2357 and increased in power, reaching full power on February 27 at 2045.

4 1-

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 3/15/82 ,

COMPLETED BY J. A. Reavis TELEPHONE vnA_271 R552 OPERATING STATUS Oconee #2 Notes

l. Urdt Name:

Februarv. 1982 Year-to-date and cummulative

2. Reporting Period:

capacity factors are calcu-

3. Licensed Thermal Power OlWt): 2568 lated using a weighted
4. Nameplate Rating (Gross alwel: 934 average for maximum 5.,Desi %n Electrical Rating (Net 31We): 886
6. Ma.timum Dependable Capacity (Gross MWe): 809
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Repott. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

!!. Hours in Reportmg Period 672.0 1 416.0 65 521.0

12. Number Of Hours Reactor Was Critical 0.0 0.0 46 208.4
13. Reactor Reserve Shutdown Hours - - -

14 Hours Generator On.Line 0.0 0.0 45 228.4

15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energ; Generated (MWH) 0 0 106 034 812 i 17 Gross Electrical Energy Generated (MWH) 0 , _ ,

0 36 076 786

18. See Electrical Energy Generated (MWH) -1 119 -4 139 34 228 709
19. Urut Service Factor 0.0 0.0 69.0
20. Uma Avsilability Factor 0.0 0.0 69.0
21. Unit Capacity Factor t Using MDC Net) __

0.0 0.0 60.5

22. Unit Capacity Factor iUsing DER Net) 0.0 0.0 59.0
23. Unit Forced Ourage Rate 0.0 0.0 17.6
4. Shutdowns Scheduled Over Next e Months iType. Date.and Duration of Eacht:

Currently refueling

25. If Shur Down At End Of Report Period. Estimated Date of *,:artup: April 16, 1982
26. Units in Test Status a Pnor to Commercial Operation): Forecast Achieved j INITIA L CRITICA LITY l INITIAL ELECTRICITY l COMMERCIAL OPER A TION l im- ,

. r CORRECTED COPY '

50-270 i

UNI'l SillilDOWNS ANI) POWER REisUCilONS DO(.KET NO.

UNIT NAME Oconee 2 .

. D A~I E 3/15/82 COMPLETED HY J.A. Reavis RI: PORT MONTil January. 1982 TELEPilONE (704)373-8552 i

-, 5g 'h kE> t.icensee ,E-s, , Cause & Corsective No.

! Dat e i 3g 4 2se liveni 3,7 e.~8 Action to

  • .jE 5 5 ;p, 5 e

Report u mV o

EU Prevent Itcentrente g

C 1 82-01-01 S 480.00 C --

RC FUELXX Scheduled refueling / inspection (10 yr.

ISI) in progress.

lA 82-01-21 S 264.00 B --

CA VESSEL Core support assembly bolt replacement in progress.

NSM's and other mainentance.

I 2 3 4

1 I osced Re.asin, Melhott: lixliihit G . Instinctions S S hed uleil A-l qnipinent Failnre(Explain) _ l-Manual for Prepaiation of D.na ll Maintenance or Test 2 Mannat Serain. linary Sheets f or I.scensee C Refneling 3 Autoinalic Sti.nn. Event Report (I I:R) 17s le (NilRI.G-D.Regulasury Resitiction 4 Ollier (lixplain) 0161) 1 Ope.ator Tsaining i 1.icense lhamin.iiion l ~- Athninist ra t ive 5 G Opeiational I iror (1:xplain) lisinbit I Same Source l's/7 7 ) li Olher (lisplain)

UNIT SiluTDOWNS AND POWEll itEDUCIlONS DOCKET NO. -

7 UN!1NAME DATE 3/15/82

  • COMPLETED IlY L A. Re:nvis Iti:POltT A10NTil February, 1982 TELEPilONE (704)373-8552 e.

C_ rs 5 us : . n 5 '%

~

u 2O E 3 E ~$ l leCll5CL' .C 4, o CJHW d fof reeltse N ', Date ~? livent py-i i i sE E- ? Actionto a I d ~gg e Itepose a nu 8O Prevent Itecurrence e  ; o Q

IA 82-02-01 s 672.00 B --

CA VESSEL Core support assembly bolt replace-ment /10 yr. ISI/NRC MSN's in progress.

Other maintenance continues.

I 2 1 4 12: Forceil Iteamn. Method: Exhibit G -Insernerions S. Stheiluteil A l'iguipinent Failure (laplain) 1 Manual for Preparation of Data ll-Maintenance of Test 241anual Scra m. lintiy Sheets for I.seensee C itefueling .l Automatic Stram. lisent Iteport (I.010 File INtilli.G-D Itegul.itory itestsiction 4-Other (Explain) 0161)

I? Ope.ator Training & Licenw lixamination I .Athninist alive 5 G-Opciation.il Es tor (lisplain) Eshibil 1 - Same Sousee

(9/77) Il Osher (lixplain) l t

AVER.tGE D ALLY LNIT Powga tgygt OCCKET NO. 50-270 LNIT oconee 2

-DATE 3/15/82 CO\iPLEND BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH February, 1982 DAY AVERAGE DAILY POWER LEVEL DAY i3tw, Net AVERAGE DAILY ?OhER LEVEL t.\lhe Neci I 17 J 19 4

20 21 6 ,,

04 9 -

25 10 ,5 I *, ..

12 23 I .'

29 14 30 15 31 l -

16 l

l I

I

'NSTRL'CTICNS l

l Cn t.'.:s for: :t. hst :.'.e ;.cr:ge j:tly t .;wer e.,e ;,3

  • l*.i.e ye ,. . ,3 g ,3 ; .,,,...f

.: nearest c nete . .ej:w::-

2., -

> - *i- et, ~ -.ae ,

l l

I

.st-,

MONTHLY REFUgLING INFORMATION REOUEST

1. Facility name: Oconee Unit 2 .
2. Scheduled next refueling shutdevn: Unknown .
3. Scheduled-restart following tefueling: Unknown ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?Yes .

~If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

If no, when is review scheduled? N/A .

5. Scheduled date(s) for .ubmitting proposed licensing action and supporting inf orma tion: Unknown -

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7. Number of fuel asse=blies (a) in the core: 177 .

(b) in the spent fuel pool: 769 ,

8. Present licensed fuel pool capacity: 1312 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity:

DUKE PCWER COMPArt Date: March 15, 1982 .

Name of

Contact:

_ J. A. Reavis ,

  • Represents the total for the combined Units 1 cnd 2.

DOCKET NO: 50-270~  !

' UNIT: .0conee 2 _

DATE: March 15, 198':

i NARRATIVE

SUMMARY

Month: February, 1982

-Oconee 2 continues in an outage for refueling / core support. assembly bolt-replacement /10 yr. ISI/NRC required NSM's and other maintenance.

-l e

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 3/15F COhlPLETED BY J. A. Reavis TELEPHONE 7na 177 R552 OPERATING STATUS Oconee #3 Notes

1. Unit Name:
2. Reporting Period: February. 1982 Year-to-date and cununulative capacity factors are calcu-
3. Licensed Thermal Power (MWt): 2568 g
4. Nameplate Rating (Gross SIWet: 934 g
5. Desi ln Electrical Rating (Net StWe): 886 dependable capacity.
6. Staximum Dependable Capacity (Gross 5twel: 809
7. Staximum Dependable Capacity (Net StWe): 860
3. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which ReGricted. !f Any (Net atWe):
10. Reasons For Restrictions. If Any:

This Sionth Yr..to.Date Cumulative

11. Hours in Reportmg Period 672.0 1 416.0 63 168.0
12. Number Of Hours Reactor Was Critical 364.3 1 108.3 46 422.2
13. Reactor Reserve Shutdown Hours -
14. Hours Generator On Line 364.0 1 108.0 45 424.1
15. Un;. Reserve Shutdown Hours - - -
16. Gross Thermal Energy Generated (SIWH) 926 682 2 835 222 110 353 962 17 Gross Electrical Energy Generated (StWH) 321 870 ._. 981 780 38 128 594
15. Net Electrical Energy Generated (SIWH) 307 154 940 272 36 291 748
19. Umt Service Factor 54.2 78.3 71.9
20. Umt Availability Factor 54.2 78.3 71.9
21. Unit Capacity Factor (Using SIDC Nett 53.2 77.2 66.6
22. Unit Capacity Factor (Using DER Net) 51.6 75.0 64.9 l
23. Unit Forced Outage Rate 45.8 21.8 15.2 2& Shutdowns Scheduled Over Nest 6 Alonths tType. Date.:nd Duration of Eacni:

Ref uelinst May 30. 1982 -- 15 weeks l

l

25. If Shut Down At End Of Report Period. Estimated Date of '.,::rtup: March 24, 1982 l
26. Units in Test Status iPnor to Commeremi Operation s: Forecast Achieved l

INITIA L CRITIC.\ LITY INITIAL ELECTRICITY COstStERCIA L OPER A TION pn- ,

IIOCKET NO. 50-287 -

UNITSilUTDOWNS AND POWi.R REDUCllONS Uconee 3 .

UNIT N AME DATE 3/15/82 le n' ORT Af 0NTil February,1982 COMPLETED HY ' J. A. Reavis TELEPIIONE (704) 373-8552

=_ e. 5 u, - E  %

-, 2 :- s ,s% la.censee gs c% cause & cuirective No . Dsle i

5@ i 2s5 livent s9 N0

$" Action to

$5 ch 55C e g Reposi # SU o Prevent Recurrence O

4 82-02-16 F 308.05 A 1 CB HTEXCH Unit removed from service to repair a tube leak in the 3A steam generator.

l l 2 1 4 I" Forced Reamn: Alethod: Exhibit G . Instructions S. Ssi.esinled A l?iluipinent Failure (Explatn) I Manual for Preparation of Data ll Maintenance of Test 24f anual Scram. Entry Sheets for I.ieensee C-Itefueling .1 Autunutie Senant. livent Report (I.I'lO FileINtlRiiG-D Regulatory Resliiction 4 Other (lixplain) 01bli 1:-Ope.ator Training & I.icense lixainination I Admirnstrative 5 ,

G-Opeiational Es ror (lisplain) Esliibit I - S une Sousee 19/77) Il-Other (lixplain)

. AVERAGE D AILY UNIT ?OWER LEVEL DCCKET NO. 50-287 LNIT oconee 3 D ATE 3/15/82 ,

COMPLEED BY J. A. Reavg TELEPHONE (704)??3-8552 310 NTH February, 1982 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DAILY ?OWER .'.IVEL iMWe-Ner1 i 31we. Net a 859 g- -

859 g3 3 859 gg -

4 858 -

10 g 858 g o 857 ,, -

- 855 , -

3 3 856 -

3 9 853 ~

25 10 852 -

3 11 855 --

1, 853 ,

.S II RSS ;9 14 855 30 15 836 3; t o-27 l

!NSTRUCTICNS Cn t..:s fer: :t. hst :ne r.er:ge : !y . :: :*er 'e.et ., '.tweAe: : m:. :.. - . e . .: ; . c:-

..-.a,.,

.: .ie:res: c neie . .e;:w:::

. s; -i

MONTHLY REFUELING INFOU!ATION REOUEST

1. Facility name: Oconee Unit 3 .
2. Scheduled next refueling shutdcun: May, 1982 .
3. Scheduled restart following refueling: September, 1982 ,
4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license a=endment? Yes .

If yes, what will these be?

, Technical Specification Revision 2

If no, has reload design and core configuration been reviewed by Safety Review Com:nittee regarding unreviewed safety questions? N/A .

If no, when is review scheduled? N/A .

5. Scheduled date(s) for submitting pro osed licensing action and supporting inf o rma tion: March, 1982
6. I=portant licensing considerations (new or dif ferent desian or supplier, unreviewed design or performance analysis methods, significant changes in J

design or new operating procedures).

4

7. Number of fuel assemblies (a) in the core: 177 (b) in the spent fuci pool: 330 ,

S. Present licensed fuel pool capacity: 500 ,

Siae of requested or planned increase: .

9. Projected date of last refueling which can be accoc=odated by present licensed capacity:

DUKE PCWER COMPA!rt Date: March 15, 1982 ,

i Name of

Contact:

J. A. Reavis

,- . - . -- - . - - - .- - ,n

e DOCKET NO: 50-287 UNIT: Oconee 3 DATE: March 15.-1982 NARRATIVE

SUMMARY

Month: February, 1982 Oconee 3 operated at near full power until February 16 when it was removed from service to repair a tube leak in the 3A steam generator. Repairs continued through the remainder of the month.

A '%

i 4

4 i

I f

4 i,

f i

l OCONEE NUCLEAR STATION l

Operating Status Report l ,

1. Personnel Exposure:

4 For the month of January, 8 individual (s) exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.830 rem, which represents approximately 15.3% of that person's allowable

, annual limit.

2. The total station liquid release for January has been compared with the Technical Specifications annual value of 15 curies; the total release for Jar.uary was less than 10 percent of this limit.

The total station gaseous release for January has been compared with the derived Technical Specifications annual value of 51,000 curies; the e total release for January was less than 10 percent'of this limit.