Forwards QA Program Insp Rept 99900387/81-02 on 811214-18 & Notice of Nonconformance
ML20041G127
Person / Time
Issue date: 02/26/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bissonnette P
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML20041G128 List:
References
REF-QA-99900387 NUDOCS 8203190299
Download: ML20041G127 (3)


Text

-

FEB 2 0 M Docket No. 99900387/81-02 k

to S

General Atomic Company g

U@F'O 9

Special Products l,g}p y 3 gg ATTN:

Mr. P. E. Bissonnette 5

riusc.yw.[" n,f General Manager mnaud Post Office Box 81608 M

f' San Diego, California 92138

'f p

Gentlemen:

This refers to the inspection conducted by Mr. W. M. McNeill of this office on December 14-18, 1981, of your facility at San Diego, California, associated with the fabrication of radiation monitors and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made as a result of the issuance of 10 CFR Part 21 reports pertaining to:

(1) Area Monitor Countrate Assemblies, RP-2C, that had been furnished to the Zion Nuclear Power Station, Units Nos. 1 and 2; and (b) Rockbestos Coaxial Cable, RSS-6-104, that had been furnished to numerous nuclear power stations.

Also, there was a written notification of inadequat" electrical insulation on Ex-Core Neutron Flux Detectors that had been turnished to the Waterford Nuclear Power Station, Unit No. 3.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that h' ave been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

CS h.

RIS VI8 AIES RA-1h WMcNeill/bb WEFoster UPo apovs KVSeyfrit JTCollins 2/1/82 2////82 2/ /82 2b6 /82 2/>(./82 i

,/

8203190299 820226 PDR GA999 ENVGAT lk(L 99900387 PDR

o P

General Atomic Company 2-The response requested by this letter is not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), 't is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) sub-mit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, "Orialnal Signed byg U. POTAPOVS" Uldis Potapovs, Chief Vendor Inspection Branch

Enclosures:

1.

Appendix A - Notice af Nonconformance 2.

Appendix B - Inspection Report No. 99900387/81-02 3.

Appendix C - Inspection Data Sheets (9 pages)

/

General Atomic Company 3