Forwards IE Insp Repts 50-338/82-03 & 50-339/82-03 on 820201-05.No Noncompliance Noted
ML20041F784
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/24/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20041F785 List:
References
NUDOCS 8203170412
Download: ML20041F784 (2)


See also: IR 05000338/1982003

Text

Je/bul

"

.

. ,

,

J

~

FEB 241982

c

Virginia Electric and Power Company

C

ATTN: Mr. R. H. Leasburg, Vice President

.

'4%

,h

Nuclear Operations

d

.

P. O. Box 26666

NlD P

IO

Richmond, VA 23261

C

0

.s ?

Q

/

. ~

'

Gentlemen:

A

%/

Subject: Report Nos.6338/82-Q3 'and 50-339/82-03

gb;e

x\\

s

This refers to the routine safety inspection cond ated by Mr. L.

ranklin of

.

this of fice on February 1-5,

1982, of activities authWed by NRC License

Nos. NPF-4 and NPF-7 for the North Anna facility and to tne discussion of our

findings held with Mr. W. R. Cartwright, Station Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the-

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were d,isclosed.

We have examined actions you have taken with regard to previously identified

-

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

sl

F. Long, Acting Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

!

Enclosure:

,

(See Page 2)

l

4

6

8203170412 820224

PDR ADOCK 05000338

[Of f

0

PDR

j

. . .

_

'

'

'

FEB 241982

Virginia Electric and Power Company

2

Enclosure:

Inspection Report Nos.

50-338/82-03 and 50-339/82-03

cc w/ enc 1:

P. G. Godwin, Director, Nuclear Security

J. H. Ferguson, Executive

.

Vice President

W. R. Cartwright, Station Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

Commonwealth of Virginia

,

RII

RII

RII

RII

RII

(4

h

47tJV

LFranklin:aw

KBa m/82

AFGib on

Kland s

FSC-= t rell

02/d 82 ff

02/(V82

02/s /82

02/7J82

02/'t

4

,