Forwards IE Insp Repts 50-327/81-39 & 50-328/81-48 on 811006-1205 & Notice of Violation
ML20041F778
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/18/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041F754 List:
References
NUDOCS 8203170405
Download: ML20041F778 (2)


See also: IR 05000327/1981039

Text

T

p

-

-

.

.

N 18 M

,

,

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nosh 27/81-3hnd 50-328/81-48

This refers to the routine safety inspection conducted by Mr. E. J. Ford of this

office on October 6 - December 5,1981, of activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for the Sequoyah facility. Our preliminary

findings were discussed with Mr. C. C. Mason, Plant Superintendent, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of-

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit _ written

application to withhold infonnation contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements -

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of llanagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8203170405 820309

PDR ADOCK 05000327

0

PDR

t

,

3

.

.

JAN 181912

2

Should you have any questions concerning this letter, we will be glad to discuss

-

them with you.

!

Sincerely,

b

rd

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection -

Enclosures:

j

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-327/81-39

and 50-328/81.48

,

cc w/encis:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project fianager

i

C. C. _ flason , Plant

Superintendent

.

J. F. Cox, Supervisor, Nuclear

Licensing Section

j'

M. J. Burzynski, Project Engineer

!

H. N. Culver, Chief, Nuclear Safety

i

Review Staff

'

bcc w/ enc *ls:

'

NRC Resident Inspector

Document flanagement Branch

State of Tennessee

,

I

!

.

RII

RII

Ril

RII

i

Q) '

74A

!

.

dt ~

M

/06

12/' /81

EJFo

RVCr enjak

D uick

RClewis

gllg/8z

l/i8/8's

///gl1v

'//f/fV

/ur

l

,

-.

.

.

__

_

_

_ -

. .

.