Text
T
p
-
-
.
.
N 18 M
,
,
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nosh 27/81-3hnd 50-328/81-48
This refers to the routine safety inspection conducted by Mr. E. J. Ford of this
office on October 6 - December 5,1981, of activities authorized by NRC Operating
License Nos. DPR-77 and DPR-79 for the Sequoyah facility. Our preliminary
findings were discussed with Mr. C. C. Mason, Plant Superintendent, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of-
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit _ written
application to withhold infonnation contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements -
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of llanagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8203170405 820309
PDR ADOCK 05000327
0
t
,
3
.
.
JAN 181912
2
Should you have any questions concerning this letter, we will be glad to discuss
-
them with you.
!
Sincerely,
b
rd
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection -
Enclosures:
j
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-327/81-39
and 50-328/81.48
,
cc w/encis:
H. J. Green, Director of Nuclear Power
G. G. Stack, Project fianager
i
C. C. _ flason , Plant
Superintendent
.
J. F. Cox, Supervisor, Nuclear
Licensing Section
j'
M. J. Burzynski, Project Engineer
!
H. N. Culver, Chief, Nuclear Safety
i
Review Staff
'
bcc w/ enc *ls:
'
NRC Resident Inspector
Document flanagement Branch
State of Tennessee
,
I
!
.
RII
RII
Ril
RII
i
Q) '
74A
!
.
dt ~
M
/06
12/' /81
EJFo
RVCr enjak
D uick
RClewis
gllg/8z
l/i8/8's
///gl1v
'//f/fV
/ur
l
,
-.
.
.
__
_
_
_ -
. .
.