Forwards IE Insp Repts 50-259/81-36,50-260/81-36 & 50-296/81-36 on 811130-1204 & Notice of Violation
ML20041F767
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/12/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041F747 List:
References
NUDOCS 8203170396
Download: ML20041F767 (2)


See also: IR 05000259/1981036

Text

.

ella)

.

.

J AN 121982

Tennessee Valley Authority

ATTN:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

.

Subject: Report Nos.h259/81-36230-260/81-36 and 50-296/81-36

This refers to the routine safety inspection conducted by Mr. E. H. Girard of

this office on November 30 - December 4,

1981, of activities authorized by NRC

Operating License Nos. DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility.

Our preliminary

findings were

discussed with

Mr. G. T. Jones,

Plant

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items are identified in the enclosed inspection report. These

items will be examined during subsequent inspections.

In accordance wit.,10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8203170396 820309

PDR ADOCK 05000

-

.

..

.

JA N 121982

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Sl

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-259/81-36,

50-260/81-36 and 50-296/81-36

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

RIIe,g

RII

RIIg.Y

RII rn

RII

RI '

ljt

4

/(

fWP

'

,

u

b CEMurphy

JA01shinski

1r

RClewis,51 jf/l f Y

EHGirard:ht

- A

t

-y

.f'312B//81

i$/4 /81/

12/ /81

X/ /EI

42,

12/3//81

end

ll4fff