ML20041F706

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/82-13 on 820126-29. No Noncompliance Noted
ML20041F706
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/19/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20041F707 List:
References
NUDOCS 8203170317
Download: ML20041F706 (2)


See also: IR 05000395/1982013

Text

. - __ -

-

-

.

-.

-

. _.

//fq)

...

,.

e

FE8 19 1982

o

O

%

South Carolina Electric and Gas Company

i

ATTN: Mr. T. C. Nichols, Jr. , Vice President

E

OS

6

Power Production and System Operations

k b

T7

P. O. Box 764

p #

Columbia, SC 29218

"

c-

-d-

i

e

A /?

Gentlemen:

3

'

Subject: Report No. 50-395/82-13

d TTTid "

This refers to the routine safety inspection conducted by Mr. E. H. Girard of

,l

this office on January 26-29, 1982, of activities authorized by NRC Construction

i

Permit No. CPPR-94 for the Summer facility and to the discussion of our findings

held with Mr. W. A.

Williams, General Manager, Nuclear Operations at the

conclusion of the inspection.

'

j

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

'

selective examinations of procedures and representative records, interviews with

4

personnel, and observations by the inspectors.

1

Within the scope of this inspection, no violations or deviations were disclosed.

4

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

,

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These ite.ns will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will'

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

i

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

S i' ice rely ,

s/

.

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

I-

Enclosure (See Page 2)

8203170317 820219

PDR ADOCK 05000395

_

._,

. _ . . . -

_.

_

, _ .

_

_

.

i.

.

. , .

.

.

.

,

South Carolina Electric & Gas Co.

2

FEB 191982

Enclosure:

Inspection Report No. 50-395/82-13

cc w/ encl:

J. B. Knotts, Jr.

O. S. Bradhan, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bec w/ encl:

Document Management Branch

State of South Carolina

NRC Resident Inspector

be

j

jiv

(

'

EGirard:es

/ ,-AHerdt

JRogge

Long

2M /82

/' 2/// /82

2/gy /82

2//f/82