LA)
.- -
.
.
FEB 251982
m,b
e
Georgia Power Company
(
ATTN:
Mr. J. H. Miller, Jr.
ReggpD
r
,
Executive Vice President
is .
IJ/lR 17 Jg
T
P. O. Box 4545
j
n am nruw e.gg '6
Atlanta, GA 30302
.
\\,
Ei*7 g.ai d,%_.
,
s
Gentlemen:
g
.r^
Subject:
Report No. 50-321/82-06
=
This refers to the special safety inspection conducted by Mr. J. M. Puckett and
Mr. L. A.
Franklin of this office on February 11-12, 1982, of activities
authorized by NRC Operating License No. DPR-57 for the E. I. Hatch facility and
to the discussion of our findings held with Mr. T. Greene, Assistant Plant
Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
See Page 2
8203170308 820225
PDR ADOCK 05000321
""
fEcO,f
-
..
.
FEB 251982
Georgia Power Company
2
Enclosure:
Inspection Report No. 50-321/82-06
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Management Branch
State of Georgia
RII
RII
RII4
RII
RII
,
OW
Y
FT N
LFranklin:ht
KS#r
AFGib on
JRogge
FSr,e '}]
2/11/82 g
2/t'/82
2f/82
2/y$ /82
2/)S/82