Forwards IE Insp Repts 50-250/82-03 & 50-251/82-03 on 820202-05.No Noncompliance Noted
ML20041F686
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/22/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20041F687 List:
References
NUDOCS 8203170297
Download: ML20041F686 (2)


See also: IR 05000250/1982003

Text

, - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _

_ _ _

.

.

'

.

FEB 2 2 W

L

Florida Power and Light Company

g

g

ATIN: Dr. R. E. Uhrig, Vice President

7

Advanced Systems' and Technology

p

TO

g,Op'%

P. O. Box 529100

C

...

Y,

Miami, FL 33152

17

-

1-

-

4

-

t-

ti

Gentlemen:

I

~

],

gg

Repc. t Nos[0450/82 03)nd 50-251/82-03

'

D

Subject:

p

sg-

This refers to the routine safety inspection conducted by Mr. R. L. F4hdlYb<r

this office on February 2-5, 1982, of activities authorized by NRC License

Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our

findings held with Mr. H. E. Yaeger, Site Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

-

Inspection Report Nos.

50-250/82-03 and 50-251/82-03

cc w/ encl:

H. E. Yaeger, Site Manager

bcc w/ encl:

(See Page 2)

8203170297 820222

PDR ADOCK 05000250

G

PDR

f[

,

.

-

--

..

.

-

..

., .

..- ..- .

.-

.,

.

!

. .

.

.

.

FE8 2 2 1982

- Florida Power and Light Company

2

4

f

bec w/ enc 1:

NRC Resident Inspector

Document Management Branch

i

State of Florida

'

,

'

!

i

4

'

,

!

L

.

1

e

i

RII

RII

R

I

.

,}R I

R

Rf dier:aw

FJa

ARHerdt

Klan is

F ,ance

. . , . . .

. . , , , , ,

.g,,,.,,,,,.

.. c,..

c . ,,,. .

^

1

t

- - _ _ _ . _ _ _ _ - . _ . . . . _ , . . _ .

__.,_

. _

.

. .

_ _ .

.

. . _ . .

. . . . _ _ ,

_ . . _

_ .

__

_