ML20041F686
| ML20041F686 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/22/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20041F687 | List: |
| References | |
| NUDOCS 8203170297 | |
| Download: ML20041F686 (2) | |
See also: IR 05000250/1982003
Text
, - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _
_ _ _
.
.
'
.
FEB 2 2 W
L
Florida Power and Light Company
g
g
ATIN: Dr. R. E. Uhrig, Vice President
7
Advanced Systems' and Technology
p
TO
g,Op'%
P. O. Box 529100
C
...
Y,
Miami, FL 33152
17
-
1-
-
4
-
t-
ti
Gentlemen:
I
~
],
gg
Repc. t Nos[0450/82 03)nd 50-251/82-03
'
D
Subject:
p
sg-
This refers to the routine safety inspection conducted by Mr. R. L. F4hdlYb<r
this office on February 2-5, 1982, of activities authorized by NRC License
Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our
findings held with Mr. H. E. Yaeger, Site Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
-
Inspection Report Nos.
50-250/82-03 and 50-251/82-03
cc w/ encl:
H. E. Yaeger, Site Manager
bcc w/ encl:
(See Page 2)
8203170297 820222
PDR ADOCK 05000250
G
f[
,
.
-
--
..
.
-
..
., .
..- ..- .
.-
.,
.
!
. .
.
.
.
FE8 2 2 1982
- Florida Power and Light Company
2
4
f
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
i
State of Florida
'
,
'
!
i
4
'
,
!
L
.
1
e
i
RII
RII
R
I
.
,}R I
R
Rf dier:aw
FJa
ARHerdt
Klan is
F ,ance
. . , . . .
. . , , , , ,
.g,,,.,,,,,.
.. c,..
c . ,,,. .
^
1
t
- - _ _ _ . _ _ _ _ - . _ . . . . _ , . . _ .
__.,_
. _
.
. .
_ _ .
.
. . _ . .
. . . . _ _ ,
_ . . _
_ .
__
_