ML20041F677
| ML20041F677 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 03/02/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20041F678 | List: |
| References | |
| NUDOCS 8203170291 | |
| Download: ML20041F677 (2) | |
See also: IR 05000295/1982006
Text
e
.
gp
9, 92
%
d
-#
'
s
Docket No. 50-295
x
e
$[
dCg
Docket No. 50-304
'Ag
9 #twkkg*/Sggh
}
-
Commonwealth Edison Company
-
M
ATfN:
Mr. Cordell Reed
Vice President
-)
Doc
t
Post Office Box 767
1;;g/
7
Chicago, IL 60690
/ G
ut
Gentlemen:
This refers to the special safety inspection conducted by Mr. J. F. Norton
of this office on February 17, 1982, of activities at Zion Station, Units
1 and 2, authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48
and to the discussion of our findings with Mr. K. Graesser and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnal.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
j
this letter a written application to this office to withhold such information.
!
If your receipt of this letter has been delayed such that less thaa seven (7)
days are available for your review, please notify this office promptly so that
l
a new due date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
8203170291 820302
PDR ADOCK 05000295
G
N
.
.
Commonwealth Edison Company
2
2 1982
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be with-
held shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Loom.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
i'l H g i rai ' W f ' C . *l . !*, rel i"e."
C. E. Nore11us, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection
Report No. 50-295/82-06;
and No. 50-304/RZ -06(DErP )
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
RIII
RIII
RIII
RIyI
RII
RIII
d't , W
6)tA
'u &
$cyh
/A ' )
A
.
Norto '/jp
Williams
inds
Hayes
Lit'tle
2/25/82
3