Forwards IE Insp Rept 50-305/82-05 on 820125-28.No Noncompliance Noted
ML20041F481
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/26/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mathews E
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20041F482 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8203160541
Download: ML20041F481 (2)


See also: IR 05000305/1982005

Text

g y ,m ~ m[ ; u ; *,o q' , .-

.<

ID a i v;

L /i s

R9 2 6 N

Docket No. 50-305(DETP)

@

9

gh

Wisconsin Public Service

Corporation

ED

,

ATrN:

Mr. E. R. Mathews

9

Vice Presiden'

~

4Qg A .b I982b-

-T

Power Supply and

kp

',

Engineering

ime

7

Post Office Box 1200

Green Bay, WI 54305

4

to

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. A. Paul

of this office on January 25-28, 1982, of activities at the Kewaunee

Nuclear Power Plant authorized by NRC Operating License No. DPR-43 and

to the discussion of our findings with Mr. Hintz and others by telephone

on February 2, 1982.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

1

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify t? 's office prot ptly so that

i

Dt18;

8203160541

h5

Ib

DR ADOCK

PDR

g;;

--

--

l

.

.

Wisconsin Public Service

2

FE9 2 61sr/.

Corporation

a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part sought to

be withheld, and which contains a full statement of the reasons which are

the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter and

the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosure:

Inspection Report

No. 50-305/82-05(DETP)

cc w/ enc 1:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Stanley York, Chairman

Public Service Commission

RIII,

RIII

RIII

RIIIgy

fk-/.> (ev

2;hg)is y

g)~) i

Paul /jp

Greger

'tr '

Norelius

2/22/82

-