ML20041F481
| ML20041F481 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/26/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mathews E WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20041F482 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8203160541 | |
| Download: ML20041F481 (2) | |
See also: IR 05000305/1982005
Text
g y ,m ~ m[ ; u ; *,o q' , .-
.<
ID a i v;
L /i s
R9 2 6 N
Docket No. 50-305(DETP)
@
9
gh
Wisconsin Public Service
Corporation
,
ATrN:
Mr. E. R. Mathews
9
Vice Presiden'
~
4Qg A .b I982b-
-T
Power Supply and
kp
',
Engineering
ime
7
Post Office Box 1200
Green Bay, WI 54305
4
to
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. A. Paul
of this office on January 25-28, 1982, of activities at the Kewaunee
Nuclear Power Plant authorized by NRC Operating License No. DPR-43 and
to the discussion of our findings with Mr. Hintz and others by telephone
on February 2, 1982.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
1
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify t? 's office prot ptly so that
i
Dt18;
8203160541
h5
Ib
DR ADOCK
g;;
--
--
l
.
.
Wisconsin Public Service
2
FE9 2 61sr/.
Corporation
a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to
be withheld, and which contains a full statement of the reasons which are
the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter and
the enclosed inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspection Report
No. 50-305/82-05(DETP)
cc w/ enc 1:
D. C. Hintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Stanley York, Chairman
Public Service Commission
RIII,
RIII
RIII
RIIIgy
fk-/.> (ev
2;hg)is y
g)~) i
Paul /jp
Greger
'tr '
Norelius
2/22/82
-