ML20041F388
| ML20041F388 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/24/1982 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20041F389 | List: |
| References | |
| NUDOCS 8203160452 | |
| Download: ML20041F388 (2) | |
See also: IR 05000397/1982002
Text
__ - _____ __ _
y
g
{
{ U"
F
.
.
,
.
FEB 2 41982
Docket No. 50-397
C)
4
13ECElVED
9}
MAR 1 5gggg wig
Washington Public Power Supply System
-
N ange
-
P.
O.
Box 968
amerneugepg
g.
Richland, Washington 99352
/
Attention:
Mr.
R.
G. Matlock
N
w
Program Director
i
Centlement
Subject:
NRC Inspection
This refers to the routine inspection conducted by Mr. R.
Feil of
this office during January, 1982 of activities authorized by NRC
Construction Permit No. CPPR-93, and to the discussion of our
findings held by Mr. Feil with Mr.
C.
S.
Carlisle and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified
within the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless
you notify this office, by telephone, within ten days of the date
of this letter and submit written application to withhold information
contained therein within thirty days of the date of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
8203160452 820224
~~
PDR ADOCK 05000397
0
15 0[ 0 \\
. .a ..M.
.......h....
o" = >
v
...
...... ..
. . ...........
... ......... .......
.... ..... . . .....
.......... .......
'"*^"'> . . R .. . . En 1.1. .
....nadds..... B....Iaulkonbe r.r.y..
....
.
............ .
. ........ . . ...
. ......... ........
- > . 2131/B2. . 2M.2/.82....... 21.9/. A 2. .. ...
....... ...........
.................. ..
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . .
wee ronu ais sio.soi nacu o24o
OFFICIAL RECORD COPY
^ "'o' es22 24
l
.
FEB 241952
Wa hington Public' Power Supply System
-2-
Should you have any questions concerning this inspection, we will
be glad.to discuss them with you.
Sincerely,
Orininal sinned by
B. H. Faulkenberry
B.
11 . Faulkenberry. Chief
Reactor Construction Projects Branch
Enclosure:
NRC Inspection Report
No. 50-397/82-02
cc w/o enclosure:
R.
B.
Glasscock, Quality Assurance Director
C.
S.
Carlisle, Deputy. Program Manager
bcc:
DMB/ Document Control Desk (RIDS)
Distributed by RV:
Engelken (w/o encl)
J. Elin
Resident Inspector (5)
State of WA (Lewis)
,
. . - . ,