ML20041F267

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/82-03 & 50-306/82-03, on 820119-22.No Noncompliance Noted
ML20041F267
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/25/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20041F268 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8203160348
Download: ML20041F267 (2)


See also: IR 05000282/1982003

Text

.

,

y

~

.

.

4

,

- l E hi n n , t ,- & 1

.

m,

m ru

v

'

,

s

,

FEB 25 E82

,

, ,

\\

<

c)

A

d)

,

Docket No. 50-282(DETP)

RECEIVEO

Docket No. ,0-306(DETP)

'

226 ~I.

.

/

Northern States Power Company

3

ATrN:

Mr. Dennis E. Gilberts

asung

annou

9

nos

7

Senior Vice President

.,

_

Power Supply

~

414 Nicollet Mall

4

to

+

"

Minneapolis, MN 55401

Gentlemen:

,

.e

This refers to the routine safety inspection conducted by Mr. L. J. Hueter

of this office on January 19-22, 1982, of activities at Prairie Island

Nuclear Power Station, Units 1 and 2, authorized by NRC Operating Licenses

No. DPR-42 and No. DPR-60 and to the discussion of our findings with

Messrs. Tierney and Schuelke by telephone on February 12, 1982.

-

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of concompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by te1e-

~

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

]>48 :

jE0 b

8203160348 820225

~

PDR ADOCK 05000282

0

PDR

, - -

.

n

,

.

,

'

.

-

!

.

,

,

Th

'

FED 2 51982

' ' ' Northern States Power Company

2

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

'

l'

be accompanied by an affidavit executed by the owner of the information

'

which identifies the document or part sought to be withheld, and which

,

contains a full statement of the reasons which are the bases for the

' ',' claim that the information should be withheld from public disclosure.

>

This'section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The informa ion sought

to be withheld shall be incorporated as far as possible into a separate

part.,of the affidavit.

If we do not hear from you in this regard within

the<specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

.,

C. E. Nore11us, Director

Division of Engineering and

Technical Programs

Enclosure:

Inspection Report

No. 50-282/82-03(DETP) and

No. 50-306/82-03(DETP)

- cc w/ enc 1:

F. P. Tierney, Jr., Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John W. Ferman, Ph.D., Nuclear

Engineer, MPCA

.

m

4

s

-

,

,

t

'

-

1

RIII' >

RIII

RIIf7

RIII

Oh)/(er

$ lius

%

W

'

- -,

rel

S&eeter

~Hueter/jp

Greg

.

,

2$22

2/20/82

'

/

L

I

e

a

2

f.