Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in QA Program Insp Rept 99900403/81-03
ML20041F226
Person / Time
Issue date: 01/05/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bruggeman W
GENERAL ELECTRIC CO.
Shared Package
ML20041F203 List:
References
REF-QA-99900403 NUDOCS 8203160304
Download: ML20041F226 (2)


Text

,~

jgg 0 5 1982 Docket No. 99900403/81-03 General Electric Company Nuclear Energy Business Operations ATTil: Mr. W. H. Bruggeman Vice President and General Manager 175 Curtner Avenue San Jose, CA 95125 Gentlemen:

Thank you for your letter of Deccaber 8,1981, in response to our letter dated November 16, 1981. We note with concern that you do not concur with the nonconfomance identified in NRC inspection report 99900403/81-03 and that you nave concluded that no corrective or preventive measures are therefore required.

We have reviewed our records of the inspection and your response, and conclude that the identified nonconformance is valid.

Our records indicate that the specific Material Requests (MRs) identified by the inspector during the inspection as incomplete, improperly identi-fied or missing were brought to the attention of the cognizant GE procurement and Quality Control Engineering personnel during the inspection. The fact that you subsequently verified that the incorrect purchase order number (AJ985) exhibited on revisions 6 and 7 of MR AJ985 was corrected to XF708 and XF 750, respectively and that revision 6 of MR AJ985 and revision 0 of MR LS-9-3-5 were contained in the files as required, is indicative of the responsivenass of GE to NRC identified deficiencies.

With respect to item 1.a of the Notice of Nonconformance, QA record < copies of 31 examined MRs did not exhibit the requisite purchase order number, buyer number and account number as required. Our concern is not that a few specific MRs were incomplete, improperly identified or missing. As discussed with your staff during the exit meeting, we are concerned that as a result of not adhering to the existing procedural requirements, purchase orders that are issued as a result of hrs may not receive the required review ty cognizant engineering and quality assurance personnel and thus may not in-clude all of the technical and quality requirements contained in the FR.

8203160304 820303 PDR GA999 EMVCENE 99900403 PDR EI:E552$h

'5Ei,k'"

omce > Rly R$5

'EEiVIB' "biIlEs" iR 1 ""

! sua.we > 'DDChamberlatn/rf'CJHale" "UPotap'ovs" "JEGat)tia o-N1 1 ins"

~

"'Il 12/30/81...

.12/p(./.8 L,.12$f/.M,,.g/m/18).,, J1R,f81.,,

OFFICIAL R5 CORD COPY NnC FORM 318110 80! NRC M O240

i

~

1 General Electric Company Nuclear Energy Business Operations i The responsible engineer must " Assure that Engineering requirements iden-tified on MRs and subsequent changes in requirements identified on MRCs are incorporated in Purchase Orders" and Procurement Quality Assurance must " Assure that Purchase Orders and Purchase Order revisions correctly reflect the requirements of hrs and 14RCs."

Consequently, please describe how your procedures will assure that all pur-chase orders resulting from MRs and MRCs are reviewed by the responsible engineering and quality functions for inclusion of all of the technical and quality requirements defined by the llRs and MRCs and how these reviews will be documented. Also, please describe how you have assured that all MR and HRC QA record copies are complete and maintained and what steps you have taken to assure that Quality Engineering files are being maintained which consolidate the NRs with the Purchase Orders issued as a result of the hrs.

I Please provide this information within 25 days from the date of this letter in order that we may complete our review in a timely manner.

Sincerely,

" Original sigried WA U. POTAPOVs

Uldis Potapovs Chief Vendor Inspection Branch t