Forwards IE Mgt Meeting Rept 50-346/82-05 on 820121.No Noncompliance Noted
ML20041F136
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/25/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20041F137 List:
References
NUDOCS 8203160222
Download: ML20041F136 (2)


See also: IR 05000346/1982005

Text

.

' 2 5 R?

'

q\\

'l

[

Docket No. 50-346

gg

Toledo Edison Company

2

I

A*ITN:

Mr. Richard P. Crouse

9-

, MARF51982> 12 e

Vice President

Namu mm

)

Nuclear

asust memet a

Edison Plaza

b

I

300 Madison Avenue

Toledo, OH 43652

4

6

g

Gentlemen:

This refers to the management meeting conducted by me sad members of my

staff on January 21, 1982, at the NRC Region III office with you and members

of your staff.

The enclosed report identifies the areas discussed during the meeting. As

indicated in the report, the meeting was held to discuss your corrective

actions in the areas of drawing control, nonconformance reports, and per-

sonnel errors.

No items of noncompliance with NRC requirements were identified during the

course of this meeting.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

,

delayed such that less than seven (7) days are available for your review,

l

!

please notify this office promptly so that a new due date may be estab-

(

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

l

which identifies the document or part sought to be withheld, and which

l

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

,

I

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

1

B203160222 B20225 ~

g60 /c (

A

PDR ADOCK 05000346

0

PDR

.

Toledo Edison Company

-2-

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be piaced in the Public Document Room.

If you have any questions regarding the enclosed report please feel free

to call us.

Sincerely,

Wa17gned by R.L. spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection

Report No. 50-346/82-05

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Co:nmission

Helen W. Evans, State of Ohio

/

RI[If.(-

f

RII

RII3

jqd of

-->

unter/so

McGregbr

SLFeeter

Spessard

/

2/9/82

2j74