ML20041F095

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-245/81-17 & 50-336/81-16 on 811201-04 & 14-18.No Noncompliance Noted
ML20041F095
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/26/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20041F096 List:
References
NUDOCS 8203160184
Download: ML20041F095 (2)


See also: IR 05000245/1981017

Text

.

.

2 6 FEB G82

Docket Nos. 50-245

i'A

p\\g'

50-336

s

Northeast Nuclear Energy Company

3.'

4EdgEO

ATTN: Mr. W. G. Counsil

e

-

Senior Vice President - Nuclear

5

M48

C

J 3kh 'l /

Engineering and Operations Group

$

P. O. Box 270

,

Hartford, Connecticut 06101

s<b;'

/, ,

Gentlemen:

%

vG

_

Subject:

Combined Inspection Nos. 50-245/81-17 and 50-336/81-16

This refers to thi routine safety inspection conducted by Mr. R. E. Baer of

this office oc December 1 - 4 and 14 - 18, 1981 at Millstone Nuclear Power

Station, Units 1 and 2, Waterford, Connecticut, of activities authorized by

NRC License Nos. DPR-21 and DPR-65 and to the discussions of our findings

held by Mr. Baer with Mr. E. C. Farrell of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room, unless you notify this

office, by telephone, within ten days of the date of this letter and submit

written application to withhold information contained therein within thirty

days of the date of this letter. Such application must be consistent with

the requirements of 2.790(b)(1).

Your cooperation with us in this matter is appreciated.

Sincerely,

W

omas T. Martin, Director

Division of Engineering and Technical

Inspection

Enclosure:

NRC Region I Co

ined Inspection Report Numbers 50-245/81-17

and 0-336/

RI:l BET'P

&

Q

"

n

FfI

TP

RI:D ETP ()

TP

3

Jo ne

Baer/dmg

Collin

KrapY

W

Jf)

IL 'y V

2/24/82

,

82031601B4 020226

3b

PDR ADOCK 05000245

b]I l

,

O

PDR

[

L

_ _ _ _ .

_ _ _ _ _ _ _ _ _ _ _

.

.

Northeast Nuclear Energy Company

2

2 6 FEB E62

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

local Public Document Ro.m (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)

Director, DRPI

l

OFFICIAL RECORD COPY

l

1

l