Forwards IE Insp Rept 50-336/81-14 on 811201-04 & 14-18.No Noncompliance Noted
ML20041F079
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/26/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20041F080 List:
References
NUDOCS 8203160170
Download: ML20041F079 (2)


See also: IR 05000336/1981014

Text

0 J * A- 8 &

a

,

2 6 FEB 1982

Docket No. 50-336

-

,} e I

t\\

,9

Northeast Nuc1bar Energy Company

45 EWED

4

ATTN:

Mr. W. G. Counsil

b

,

Senior Vice President - Nuclear

.'~

$ h $ gg "'-l/

'

^

.

-

Engineering' .nd Ops: rations Group

E'

P. O. Box 270

,

Hartford, Connecticut 06101-

'

,

Gentlemen:

_

Subject:

Inspection 50-336/81-14

This refers to the routine safety inspection conducted by Mr. R. Baer of this

office on December 1-4 and 14-18, 1981 at Waterford, Connecticut of activities

authorized by NRC License No. DPR-65 and to the discussions of our findings

held by Mr. Baer with Mr. E. Farrell of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforceme'nt Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by

the inspector, and observatians by the inspector.

Within the scope of this inspec, tion, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed ;in /.he NRC Public Document Room unless you notify this office,

<

by telephone, within ten days of the date of this letter and stbmit written

I

application'to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

l

-

No reply to this letter is required.

Your cooperation with us in this matter

, is appreciated.

I,

Sincerely,

'

'

'

-

e.

,

mas T. Martin, Director

'

Division of Engineering and

--

,

Technical Inspection

Enclosure: Office of Inspection an8 Enforcement Inspection

)

. _ R po 6-t Number 50-336 1-14

r

RI05TI

RI: ETI

-

RI DETI

I:DETI

Baer:hh

Collins

n

/

Jo ner

-

2

82-

pf4h' ?/

\\%'

Sv

Ju, O} .

-

..

j'

OIFICIALRCOR COPY

B203160170 820226

,I

0

PDR

' f

PDR ADOCK 05000336

<

o

.

,

,

Northeast Nuclear Energy Company'

-2

2 6 FEB EE2

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Li

State of Connecticut

'

bec w/ encl:

i

Region I Docket Room (with concurrences)

Chief, Operational Support-Section (w/o encl)

1

,

Director, DRPI

,,

i

,

Y

.

f

0FFICIAL RECORD COPY

,

e

i

I

f

a

w

i

--

---