ML20041E790

From kanterella
Jump to navigation Jump to search
Annunciator Response Procedure Ann 4.14-2,Revision 1, Bus 8 Level Two Channel Failure
ML20041E790
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/11/1982
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20041E788 List:
References
ANN-4.14-2-C, NUDOCS 8203120312
Download: ML20041E790 (1)


Text

y 1

Jtv. c-s e

/

ANN 4.14-2-C Rev. 1

/

JAN 111982

/

P NT OPER ATIONS REVIEW COMMITTEE APPROVAL

^

Connecticut Yankee Annunciator Response Procedure No. ANN 4.14-2 b

[

/ h. N ! k k i A

'APPROV AYSTA

> @ TENDENT j

N EFFECTIVE DATE

d. o.k u 1.0 ALARM TITLE:

Bus 8 Level Two Channel Failure 2.0 MODULE NUMBER: J1,1-2 Lower

3.0 SETPOINT

74DX/1-8 agastat drop out actuated by one level two unit failure or low voltage on one phase.

4.0 SIGNIFICANCE

Indicates unit failure or low voltage one one phase.

5.0 PROCEDURE

5.1 Initiate Maintenance Request to determine which relay is in alarm and repair.

l l

Page 1 of 1 8203120312 820304 i

~

DR ADOCK 05000213 PDR L

,