Text
-
.
iL.ui 5
,
w
-
r
Cb
Docket No. 50-304
S
RECEIVGD
Commonwealth Edison Company
g
Q
g 1 01982 * h
ATTN:
Mr. Cordell Reed
t
-
"QyD:
Vice President
at uurf,a
8d
Post Office Box 767
9
In:
{P
Chicago, IL 60690
Co
/
Gentlemen:
N
This refers to the routine safety inspection conducted by Mr. W. J. Key of
this office on October 13-14, 1981 and February 3-4, 1982, of activities at
Zion Station, Unit 2, authorized by NRC Operating iicense No. DPR-48 and to
the discussion of our findings with Mr. K. Grasser and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
l
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this offir promptly so that
a new due date may be established.
Consistent with Section z.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
e
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
h
,
8203110254 820224
PDR ADOCK 05000304
Qj
0
. .
.
..
- -
.
..
. . _ . . _ _
_.
l
'
.
I
Commonwealth Edison Company
-2-
pgg.1 N
2I
i
withheld shall be incorporated as far as possible into a separate part of the
t
l
If we do not hear from you in this regard within the specified
!
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room,
l-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
16l-fa7 Idd 8 %
C C. E. Norelius, Director
Division of Engineering and
Technical Inspection
i
Enclosure:
Inspection
l
Report No. 50-304/81-22
cc w/ enc 1:
,
l
Louis 0. De1 George, Director
of Nuclear Licensing
!
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
R:sident Inspector, RIII
l
Mary Jo Murray, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
Key /so-l{2.
gh
ff
h3
i
Danielson
Mayes
Little
t
Norelius
2/10/82
2
f/
2/e
-v
,