. _ _ _.
=. -
e t
SSINS No.: 6835 Accession No.:
stetekste+ss Salv2&W4/05 IN 82-01, Rev. 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 February 26, 1982 IE INFORMATION NOTICE NO. 82-01, REV. 1: AUXILIARY FEEDWATER PUMP LOCK 0UT i
RESULTING FROM WESTINGHOUSE W-2 SWITCH CIRCUIT MODIFICATION I
Due to a reproduction problem, Figure 3 of IE Information Notice No. 82-01 was incomplete as issued to some power reactor facilities holding an operating 1
license or construction permit. A reissue of Figure 3 is attached. Table 1 is also revised to further clarify the circuit diagrams.
No specific action cr response is required at this time.
If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office.
Attachments:
1.
Figure 3 and Table 1 2.
Recently issued IE Information Notices b
i 0
c ll I (,Y 8203110139 820226 PDR ADOCK 05000010 o l G
O b S-li:
IN 82-01, Rev. 1 CS C_SJJ.CTO 5
February 26, 1982
-_ CS e - - - - - - -,
i Oy-C s
n
-,AS
, y
)
s +__s I
i s
i I
I I
+ _ _ x _ _ s'- _ _ _ _ _ _ _ _ _ _ s, _
s 4
~
(n- - _,
')
7
_Y._ '-
"i iR b ~~
I 5
i LS I Y ~'"l55
' - - - - - "I
-b
- s2 ~2 52 s a b
a 52 _
b Ig mgp X
Y (
COIL f
NOTE: TRIPPING BREAKER WITH AUTO-START SIGNAL PRESENT WILL OPEN CONTACTS AND -, AND OPEN CONTACT E. THE SNEAK PATH CTO O
a WILL PERSIST IN KEEPING (Y) Coll ENERGlZED THEREBY PREVENTING CONTACTS 1 ANDd FROM CHANGING STATUS TO ENERGl2E THE b
a UNLATCHING (X) COLL AND RECLOSE THE BREAKER ON DEMAND.
Figure 3 Sneak Path in Control Switch " Neutral" Position with Auto Start Signal Present TABLE 1 Legend for Figures 1-3 CS Control Switch, Spring Return to Neutral X Closing Coil (contacts are closed only in switch position designated; C = closed; Y Anti-Pump Coil T = tripped; O = neutral; etc.)
LS Limit Switch / Breaker Charging Y Y Spring Status a,b ANTI-PUMP C0ll CONTACTS (a = contact closed when 52 52 spring charged, b = contact a,b Breaker Auxiliary Contacts closed when spring discharged)
(a = contact closed when Breaker closed, b = contact closed when Breaker openf_d)
Sneak Power Path AS Safeguards Contacts (closed for Auto-Start)
J
}
IN 82-01, Rev. 1 February 26, 1982 RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No.
Subject Issue Issued to 80-32 Clarification of Certain 02/26/82 All facility, Rev. 1 Requirements for Exlusive-materials and Use Shipements of Radio-Part 50 licensees active Materials 82-02 Westinghouse NBFD Relay 01/27/82 All power reactor Failures in Reactor facilities holding Protection Systems at an OL or CP Certain Nuclear Power Plants 82-01 Auxiliary Feedwater Pump 01/22/82 All power reactor Lockout Resulting from facilities holding Westinghouse W-2 Switch an OL or CP Circuit Modification 81-39 EPA Crosscheck Program -
12/23/81 All power reactor Low Level Radiolodine in facilities holding Water Test Program an OL or CP 81-38 Potentially Significant 12/16/81 All power reactor Equipment Failures Resulting facilities holding from Contamination of Air-an OL or CP Operated Systems 81-37 Unnecessary Radiation 12/15/81 All power reactor Exposure to the Public and facilities holding Workers During Events byproduct material i
Involving Thickness and licenses Level Measuring Devices 81-36 Replacement Diaphragms for 12/3/81 All power reactor Robertshaw Valve (Model facilities holding No. VC-210) an OL or CP 81-35 Check Valve Failures 12/2/81 All power reactor facilities holding an OL or CP OL = Operating License CP = Construction Permit
Ti\\)
15'3 -o\\ b.I American Electric Power Service Corporation D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas and Electric Company Zimmer (50-358)
The Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455) soj A Dresden 1, 2, 3 (50-10, 50-237, 50-249)
- x La Salle 1, 2 (50-373, 50-374)
/
Quad-Cities 1, 2 (50-254, 50-265)
RECTWVErj '9 f
Zion 1, 2 (50-295, 50-304) g
,,* 1 '01982 w :
U Consumers Power Company R ain,g gggp Big Rock Point (50-155)
""{Kon s
Palisades (50-255)
/f Midland 1, 2 (50-329, 50-330)
'l Daityland Power Corporation LACBWR (50-409)
The Detroit Edison Company Fermi 2 (50-341)
Illinoic Power Company Clinton 1, 2 (50-461, 50-462)
Iowa Electric Light and Power Company l
Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367) horthern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547) j Toledo Edison Company l
Davis-Besse 1 (50-346)
Union Electric Company l
Callaway 1, 2 (40-483, 50-486) l Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50-305)
Illinois Department of Nuclear Safety pM8 k
l Gary N. Wright, Manager, Nuclear Facility Safety i