Advises That During Next Few Months,Ie Assessment Team Will Be Visiting Facilities to Review Aspects of Const Program, Including QA Program,Corrective Action Sys,Design Change Control & Electrical Cable Installation
ML20041E207
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 03/02/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8203100247
Download: ML20041E207 (2)


Text

o.

f' MAR 2 1982

,9 Docket No. 50-454 gECWg g

Docket No. 50-455 Docket No. 50-456 k-C Docket No. 50-457 3

%N g?,,P p S

Commonwealth Edison Company b

A'ITN:

Mr. Cordell Reed Vice President 4

Post Office Box 767 Chicago, IL 60690 Gentlemen:

During the next few months this office will be performing special team assessments of the construction programs at selected nuclear power plants under construction in Region III, including your Byron and Braidwood Stations. The purpose of this special effort is to determine if there are indications of existing or potential construction problems similar to some of those identified at a number of other plants under construction.

The assessment team will be composed of a Region III Section Chief as team leader, the Senior Resident Inspector, and three or four technical specialists. The corporate office and onsite phase of the assessments is expected to be approximately two weeks in duration.

The scope of the assessments will include quality assurance program inter-faces and overviews, corrective action systems, design change control, material traceability of installed structures and components, electrical cable installation, inprocess inspections, and effectiveness of quality I

control inspectors.

In assessing these areas, the team may identify areas of weakness or examples of poor practice in addition to any identified items of noncompliance. You will be expected to respond to all substantive findings identified in the assessment report.

Each plant to be assessed will be notified by this office in advance of l

the arrival of the assessment team. The specific date of arrival will be provided at that time.

In addition, specific information will be re-quested from you in advance of the team arrival date to allow proper team preparation and better utilization of the team's time at the corporate office and the site.

It would be helpful if you designate a person to be responsible for assembling the advance information we request and act as a liaison with the team in that regard.

/g

[g8 8903100247 820302 41 PDR ADOCK 05000454 G

PDR

S Commonwealth Edison Company 2

MAR 2 E'82 You are requested to provide full cooperation to the assessment team. As part of that cooperation, team members should be permitted unfettered access to the facility, and aut:orizations should be provided for the use of cameras onsite.

We appreciate your cooperation.

If you have any questions congerning this matter please contact Mr. W. S. Little of this office.

Sincerely, James G. Keppler Regional Administrator cc:

Louis 0. De1 George, Director of Nuclear Licensing

~

V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Station Superintendent R. Cosaro, Project Superintendent J. F. Gudac, Station Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Eusident Inspector, RIII Braidwood Mary Jo Murray, Office of Assistant Attorney General Myron M. Cherry RIII)

RI RIII RIII&fs"RIIIb/j0 RIII RIII RI I g1RIIJ Spe(ssqrdky Ro/Mif C Y'

N I

bil

.C so Danielson / ay Streeter nLittle pelius avis K pler 4/82 pl2 J/ 8 L 3lpulYv b 314)ib" 3y 9(y-

)

i I