ML20041E145

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts
ML20041E145
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/03/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20041E146 List:
References
NUDOCS 8203100185
Download: ML20041E145 (1)


Text

'

4 f'

V MAR 3 gggg

' oIr

<s\\.#^3 f,t 2

Docket Nos. 50 l+60

gcgje
D 9

g 50-513 MAR 9 1982

  • r a an wnu cmu y b

y;gixt WCJOT!!

T1DC 4

/

Washington Public Power Supply System P. O. Box 968 W

N 3000 George Washington Way Richland, Washington 99352 Attention:

Mr. D. W. Mazur Program Director, WNP-1 A Gentlemen:

Thank you for your letter dated February 11, 1982, informing us of the steps you have taken to correct items which we brought to your attention in our letter dated January 6, 1982.

Your corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, t

T. W. Eishop, Chief Beactor Construction l

Projects Branch bec:

Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis), Resident

%,C (

8203100185 820303 PDR ADOCK 05000460 O

PDR

-> av w av av

~~~> yarb,ut/cb Doaa.

rau1,k,e,nder g,,,,,,,

' " > 3/4/e2 g,y,/82,,

3/ /,ea

' "o "-32S m NHC FORM 318 HO 80l NRCM O240

@FFFCCOAL RECORD COPY