Informs That Region 3 Will Be Performing Special Team Assessments of Const Program to Determine Indications of Existing or Potential Const Problems
ML20041E135
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/02/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dalwyn D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8203100176
Download: ML20041E135 (2)


Text

e MAR 2 982 Docket No. 50-440 Docket No. 50-441 3NU The Cleveland Electric Illuminating

.cy MAR 091982> E A

Iwyn R. Davidson Vice President - System Sg Engineering and Construction g,

Post Office Box 5000 g

/)

Cleveland, OH 44101 Gentlemen:

During the next few months this office will be performing special team at sessments 'of the construction programs at selected nuclear power plants under construction in Region III, including your Perry Nuc1 car Power Plant.

The purpose of this special effort is to determine if there are indications of existing or potential construction problems similar to some of those identified at a number of other plants under construction.

The assessment team will be composed of a Region III Section Chief as team leader, the Senior Resident Inspector, and three or four technical specialists. The onsite phase of the assessments is expected to be approximately two weeks in duration.

The scope of the assessments will include quality assurance program inter-faces and overviews, corrective action systems, design change control, material traceability of installed structures and components, electrical cable installation, inprocese inspections, and effectiveness of quality control inspectors.

In assessing these areas, the team may identify areas of weakness or examples of poor practice in addition to any identified items of noncompliance. You will be expected to respond to all substantive findings identified in the assessment report.

Each plant to be assessed will be notified by this office in advance of the arrival of the assessment team. The specific date of arrival will be provided at that time.

In addition, specific information will be re-quested from you in advance of the team arrival date to allow proper team preparation and better utilization of the team's time at the site.

It would be helpful if you designate a person to be responsible for assembling the advance information we request and act as a liaison with the team in that regard.

I 8203100176 820301 0

$$p/ h PDR ADOCK 05000440 E

a PDR

e Cleveland Electric Illuminating 2

%R 2 GB Compan)

You are requested to provide full cooperation to the assessment team. As part of that cooperation, team members should be permitted unfettered access to the facility, and authorizations should be provided for the use of cameras onsite.

We appreciate your cooperation.

If you have any questions concerning this matter please contact Mr. W. S. Little of this office.

Sincerely, James G. Keppler Regional Administrator cc: DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Harold W. Kohn, Power Siting Commission Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio RJ I h III RIII RIII /