ML20041E133
| ML20041E133 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 02/23/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20041E134 | List: |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8203100175 | |
| Download: ML20041E133 (2) | |
See also: IR 05000409/1982001
Text
.
%*
' . .
FEB 2 31982
e
h
[ 4;
9Ecg%
Docket No. 50-409
D
Dairylend Power Cooperative
h
b d Qg kh ^Ig
8
NITN:
Mr. F. W. Linder
C
General Manager
2615 East Avenue - South
1
La Crosse, WI 54601
,
Gentlemen:
This rafers to a special inspection conducted by Messrs. L. G. McGregor
and W. L. Axelson of this office on January 27-28 and February 9, 1982,
of activities at the Lacrosse Boiling Water Reactor, Unit 1, and to the
discussion of our findings with Mr. J. Parkyn and other members of your
staff at the conclusion of the inspection.
This inspection of your prompt public notitivation/ warning system was
conducted to determine whether your system as described in your letters
of January 22 and February 2, 1982, has been installed and tested. Final
judgement to determine if your system meets the full design objectives
of Appendix 3 of NUREG-0654 will be made jointly by NRC and FEMA in the
near future.
Our interim findings indicate that your system appears to meet the require-
ments of 10 CFR 50, Appendix E, Section IV.D.3.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
8203100175 820223
l
1
-
PDR ADOCK 050C0409
I
-
G
r
2
_
___
_
_
_
.
-
._ ..
t
$*
Dairyland Power Cooperative
2
i
.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intentim
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Sincerely,
0
wN N
ff
L$40fYo*7
J. A. Hind, Director
Division of Emergency Preparedness
and Operational Support
Enclosure:
Inspection Report
No. 50-409/82-01(DEPOS)
cc w/ enc 1:
R. E. Shimshak, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Stanley York, Chairman
Public Service Commission
RIII
RIII
RI I
RIII
RIII
RI
fU
rV
0V
Patt son /jp
Pag laro
elson
PapAriello
nd
H nter
2/20/82
2,[2,L
t,l tp
,
g,