Forwards IE Insp Repts 50-321/81-27 & 50-366/81-27 on 811026-30 & Notice of Violation
ML20041D678
Person / Time
Site: Hatch  
Issue date: 12/03/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20041D668 List:
References
NUDOCS 8203080605
Download: ML20041D678 (2)


See also: IR 05000321/1981027

Text

.

,

DEC 0 31981

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos.6321/81%and 50-366/81-27

This refers to the routine safety inspection conducted by Mr. P. H. Skinner of

this office on October 26-30, 1981, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the Hatch facility.

Our prelimi-

nary findings were discussed with Mr. M. Manry, Plant Manager, at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter ano submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

c

Paperwork Reduction Act of 1980, PL 96-511.

8203080605 820223

PDR ADOCK 05000321

'

O

PDR

_

.

.

'

'

DEC 0 31881

'

-

-

Georgia Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Leris, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/81-27

and 50-366/81-27

cc w/ encl:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

,

C. E. Belflower, Site QA Supervisor

'

bec w/ enc 1:

)

NRC Resident Inspector

l

Hugh S. Jordan, Executive Secretary

Document Management Branch

State of Georgia

l

!

!

!

,

t

1y

.

RI

RII

R

RII

D

-

jf

44f

PSkinner:es

CUpri ht

Churpy

J lshinski

ogge

PKellogg

Ilp/81

11 g /81

11/;;)/81

/ /81

W /81

11/ /81

I

/t

) 1. 1